{"id":137,"date":"2015-11-07T04:09:27","date_gmt":"2015-11-06T21:09:27","guid":{"rendered":"https:\/\/lethycorp.com\/?p=137"},"modified":"2024-07-01T09:59:11","modified_gmt":"2024-07-01T02:59:11","slug":"so-i-hope-the-program-will-be-used","status":"publish","type":"post","link":"https:\/\/lethycorp.com\/en\/hoi-dap\/nen-mong-cong-trinh-dan-dung.html","title":{"rendered":"Solutions for building civil engineering foundations"},"content":{"rendered":"<p class=\"wp-block-paragraph\"><em><strong><span style=\"font-size: small;\">For a construction project, foundation construction is extremely important, so choosing a reasonable civil construction foundation solution is also essential so that the project still ensures its load-bearing capacity. , ensuring construction progress without waste.<\/span><\/strong><\/em><\/p>\n\n\n\n<h6 class=\"wp-block-heading\">Solutions for building civil engineering foundations<\/h6>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">Arguing for solutions to build civil engineering foundations is very important, from which we can propose a reasonable and complete type of work and survey volume. The argument is conducted on the basis of existing geological survey documents of the project in the previous stage and the expected project scale.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">Our work is to demonstrate the solution to build appropriate foundations for civil works. Of course, the geological surveyor of the project is not the foundation designer, but must have certain knowledge about the foundation to be able to advise the designer on appropriate foundation solutions (if the project does not have any). special).<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">But not everyone realizes the important significance of this argument, especially students and less experienced geotechnical engineers. First, we must understand that geological survey work helps designers choose the most economical solution for building civil engineering foundations, but must ensure technical and safety standards.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">That is, always choose the solution to build the foundation of civil works with the lowest cost and simplest construction. After calculating stability (according to bearing capacity and deformation), the foundation option that is guaranteed is selected. If stability is not guaranteed, plan <span style=\"font-size: small;\">Construction of civil engineering foundations<\/span> Others will be chosen to ensure technical requirements, of course the cost will be more expensive. Cost level for the solution <span style=\"font-size: small;\">Construction of civil engineering foundations<\/span> gradually increase (relatively compared) according to the following nail types:<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">Solutions for building civil engineering foundations<\/span><br> <span style=\"font-size: small;\">\u2013 Simple strip footing. <\/span><br> <span style=\"font-size: small;\">\u2013 The strip foundation has been reinforced with bamboo piles, mangrove piles, sand cushions, etc. <\/span><br> <span style=\"font-size: small;\">\u2013 Nails <a href=\"https:\/\/lethycorp.com\/en\/\">driving pile<\/a>. <\/span><br> <span style=\"font-size: small;\">\u2013 Driven pile foundations. <\/span><br> <span style=\"font-size: small;\">\u2013 Nails <a href=\"https:\/\/lethycorp.com\/en\/component\/content\/article\/51-cong-nghe-xay-dung\/292-coc-khoan-nhoi.html\/\">pile<\/a>. <\/span><\/p>\n\n\n\n<div class=\"wp-block-uagb-image uagb-block-1429c1f4 wp-block-uagb-image--layout-default wp-block-uagb-image--effect-static wp-block-uagb-image--align-none\"><figure class=\"wp-block-uagb-image__figure\"><img loading=\"lazy\" decoding=\"async\" srcset=\"https:\/\/lethycorp.com\/wp-content\/uploads\/2019\/07\/truonghocquocte-5-1024x512.jpg ,https:\/\/lethycorp.com\/wp-content\/uploads\/2019\/07\/truonghocquocte-5.jpg 780w, https:\/\/lethycorp.com\/wp-content\/uploads\/2019\/07\/truonghocquocte-5.jpg 360w\" sizes=\"auto, (max-width: 480px) 150px\" src=\"https:\/\/lethycorp.com\/wp-content\/uploads\/2019\/07\/truonghocquocte-5-1024x512.jpg\" alt=\"\" class=\"uag-image-14438\" width=\"1024\" height=\"512\" title=\"school (5)\" role=\"img\"><\/figure><\/div>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\"><span style=\"font-size: small;\"><a href=\"https:\/\/lethycorp.com\/en\/\">Centrifugal pressing of concrete piles<\/a><\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">Arguing for foundation solutions requires geological engineers to have certain knowledge about foundations, practical experience and logical thinking. <\/span><br>\n<span style=\"font-size: small;\">First, we must talk about the construction load transmitted to the foundation, there are two types: transmitted to the column (concentrated load, calculated on 1 column, usually calculated for the pile cap) and evenly spread load, calculated according to the length of the foundation (foundation ice). The transmitted load is related to the foundation plan.<\/span><\/p>\n\n\n\n\n\n<div class=\"wp-block-uagb-image uagb-block-4738fdc1 wp-block-uagb-image--layout-default wp-block-uagb-image--effect-static wp-block-uagb-image--align-none\"><figure class=\"wp-block-uagb-image__figure\"><img loading=\"lazy\" decoding=\"async\" srcset=\"https:\/\/lethycorp.com\/wp-content\/uploads\/2016\/04\/Nha-May-Giay-Vinakraft-7-1024x768.jpg ,https:\/\/lethycorp.com\/wp-content\/uploads\/2016\/04\/Nha-May-Giay-Vinakraft-7.jpg 780w, https:\/\/lethycorp.com\/wp-content\/uploads\/2016\/04\/Nha-May-Giay-Vinakraft-7.jpg 360w\" sizes=\"auto, (max-width: 480px) 150px\" src=\"https:\/\/lethycorp.com\/wp-content\/uploads\/2016\/04\/Nha-May-Giay-Vinakraft-7-1024x768.jpg\" alt=\"\" class=\"uag-image-11773\" width=\"986\" height=\"768\" title=\"Vinakraft Paper Factory 7\" role=\"img\"><\/figure><\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"text-decoration: underline;\"><span style=\"font-size: small;\">1. Shallow foundation option:<\/span><\/span><br>\n<span style=\"font-size: small;\">Shallow foundations are used for medium and small-scale buildings (usually \u2264 5 stories). This type of foundation is very common in Vietnam and is the &quot;cheapest&quot; type. This type of foundation utilizes the load-bearing capacity of the uppermost soil layers. Therefore, the stability in terms of bearing capacity (represented by the conventional bearing capacity R0) and deformation (total deformation modulus E0) of these soil layers determines the stability of the structure.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\"><\/span><\/p>\n\n\n\n<div class=\"wp-block-uagb-image uagb-block-fa02c5bb wp-block-uagb-image--layout-default wp-block-uagb-image--effect-static wp-block-uagb-image--align-none\"><figure class=\"wp-block-uagb-image__figure\"><img loading=\"lazy\" decoding=\"async\" srcset=\"https:\/\/lethycorp.com\/wp-content\/uploads\/2019\/03\/solarlongan-16-1-1024x768.jpg ,https:\/\/lethycorp.com\/wp-content\/uploads\/2019\/03\/solarlongan-16-1.jpg 780w, https:\/\/lethycorp.com\/wp-content\/uploads\/2019\/03\/solarlongan-16-1.jpg 360w\" sizes=\"auto, (max-width: 480px) 150px\" src=\"https:\/\/lethycorp.com\/wp-content\/uploads\/2019\/03\/solarlongan-16-1-1024x768.jpg\" alt=\"\" class=\"uag-image-14026\" width=\"1024\" height=\"768\" title=\"solarlongan (16)\" role=\"img\"><\/figure><\/div>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\"><span style=\"font-size: small;\">Ground level after pile pressing<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">What are the geological conditions of the project so the shallow foundation method should be used? In general, layers of clay (mixed clay) in a hard to hard plastic state with a large enough thickness (usually 5 \u2192 7 m) distributed on top can be used to place shallow foundations. The common foundation burial depth is from 0.5m to 3m, depending on many factors such as the thickness of the soil layer, the depth of underground water level, and the distribution of soft soil.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">The greater the depth of burying the foundation, the higher the load-bearing capacity of the ground, but attention should be paid to the soft soil layers (mud or clay-type soil with a flexible, flowing state) distributed under it. If there is weak soil located right below the good soil layer (quite common) and within the influence range of stress causing settlement (usually 5 \u2192 10 m below the bottom of the foundation), limit the depth of burying the foundation to take advantage of the thickness of the soil. good layer on top.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">If the depth of foundation burial is too large (high excavation costs, affecting neighboring structures during construction), other solutions such as bamboo piles, melaleuca piles (if there is underground water) or other solutions need to be considered. Pile.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">In calculating shallow foundation design, the foundation size must be appropriate, usually 0.8m to 1.4m. Larger foundation sizes are often impractical, calculating the opening angle will be complicated and the floor cos (which almost no one cares about). When the load-bearing capacity problem is stable (ie the transmitted load of the structure is less than the load-bearing capacity of the ground), it is necessary to check whether the settlement of the foundation is guaranteed (ie the deformation problem)? Normal houses have limited settlement Sgh \u2264 8 cm.<\/span><br>\n<span style=\"font-size: small;\">If one of the two problems of load bearing capacity or deformation is not satisfied, you must change to another foundation plan, which is the pile foundation.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"text-decoration: underline;\"><span style=\"font-size: small;\">2. Foundation options for pressed piles and driven piles (friction piles)<\/span><\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">Used when the shallow foundation option is not technically satisfactory (unstable, highly deformed) or the cost of ground treatment in a shallow foundation is too expensive. It could be because the stratigraphy mainly consists of weak soil layers distributed above, good soil lies deep below, or the thickness of the upper layer of good soil is not large enough, the thickness is unstable, weak soil is distributed immediately. below with great thickness. Choosing a pile foundation solution must have a basis. When calculating a shallow foundation, the technique is not guaranteed.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">When designing pile foundations, the following issues should be noted:<\/span><br>\n<span style=\"font-size: small;\">\u2013 Choose piles with appropriate dimensions, main reinforcement, and stirrup reinforcement, such as 200\u00d7200, 250\u00d7250, 300\u00d7300, 350\u00d7350, 400\u00d7400, etc. <\/span><br>\n<span style=\"font-size: small;\">\u2013 The pile depth must be chosen to suit practical conditions, meaning it can be constructed normally. Usually, the design bearing capacity (PTK) of the pile is chosen as the minimum value calculated based on material (PVL), laboratory test (Pdn), and field test (Pht \u2013 calculated based on static penetration test CPT, standard penetration test SPT). For the pile to meet the design requirements, the following must be ensured: <\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">PVL &gt; Pile cap &gt; (2\u00f73) x PTK<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">In there:<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">PVL: Pile bearing capacity according to material. <\/span><br>\n<span style=\"font-size: small;\">Pile pressure: Pressure on pile head. <\/span><br>\n<span style=\"font-size: small;\">PTK: Pile bearing capacity according to design. <\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">Many THs deposit too deep compared to reality, leading to P\u0111n (or Pht) having an approximate or even greater value than PVL?! That is unreasonable because it is impossible to bring the pile to that depth with normal pressing or driving methods.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">For example: PVL = 120 T, P\u0111n = 80 T \u21d2 PTK= P\u0111n = 80 T (because it is smaller).<\/span><br>\n<span style=\"font-size: small;\">PVL = 120 T, P\u0111n = 180 T \u21d2 PTK= PVL = 120 T (because smaller)<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">Unfortunately, these errors are very common.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">In case the pile is too shallow, P\u0110n (or Pht) is much smaller than PVL, so it does not take advantage of the pile&#039;s working capacity, causing waste (having to increase the number of piles in the station while only increasing each pile by a few meters). is the increased load-carrying capacity). The direction of the pile is usually determined by the pile pressure or by the distance with the driven pile. This leads to PTK often fluctuating within a certain range as follows:<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">15 to 25 tons (200x200 piles) <\/span><br>\n<span style=\"font-size: small;\">20 to 35 tons (250x250 piles) <\/span><br>\n<span style=\"font-size: small;\">35 to 55 tons (300x300 piles) <\/span><br>\n<span style=\"font-size: small;\">50 to 70 tons (350x350 piles) <\/span><\/p>\n\n\n\n<div class=\"wp-block-uagb-image uagb-block-953207a2 wp-block-uagb-image--layout-default wp-block-uagb-image--effect-static wp-block-uagb-image--align-none\"><figure class=\"wp-block-uagb-image__figure\"><img loading=\"lazy\" decoding=\"async\" srcset=\"https:\/\/lethycorp.com\/wp-content\/uploads\/2012\/03\/lethy_epnhadan2-1024x768.jpg ,https:\/\/lethycorp.com\/wp-content\/uploads\/2012\/03\/lethy_epnhadan2-scaled.jpg 780w, https:\/\/lethycorp.com\/wp-content\/uploads\/2012\/03\/lethy_epnhadan2-scaled.jpg 360w\" sizes=\"auto, (max-width: 480px) 150px\" src=\"https:\/\/lethycorp.com\/wp-content\/uploads\/2012\/03\/lethy_epnhadan2-1024x768.jpg\" alt=\"\" class=\"uag-image-5365\" width=\"1024\" height=\"768\" title=\"lethy_epnhadan2\" role=\"img\"><\/figure><\/div>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\"><span style=\"font-size: small;\"><a href=\"https:\/\/lethycorp.com\/en\/\">Pressing piles of people&#039;s houses<\/a><\/span><\/p>\n\n\n\n<p class=\"has-text-align-left wp-block-paragraph\"><span style=\"font-size: small;\"><a href=\"https:\/\/lethycorp.com\/en\/\"><\/a><\/span><span style=\"font-size: small;\">Thus, with a determined pile size, PTK only reaches a certain value, leading to the design pile depth having to be appropriate (not placed anywhere). What about the number of piles in 1 station? When calculating, many THs use arithmetic rounding, which means rounding up if the odd number is greater than 0.5 (for example, 3.6 is rounded to 4 piles) and rounding down if the odd number is less than 0.5 (for example, 3.2 rounded into 3 piles). The case of rounding down is very dangerous because the remaining piles have to carry the excess load, easily causing instability.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">In addition, attention must be paid to construction conditions and methods. Pile driving is not permitted in urban areas, counter-loading is not feasible in confined spaces (anchoring is required), and piles cannot be driven flush against adjacent buildings. In many cases, piles fail to reach the designed depth due to excessive friction from the upper soil layers (requiring pilot drilling), etc.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"text-decoration: underline;\"><span style=\"font-size: small;\">3. Bored pile foundation plan:<\/span><\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">The bored pile foundation option is often used for high-rise buildings (usually over 10 floors). Bored piles are often more expensive than pressed piles, so no one wants to use them, except in cases where forced piles (or driven piles) do not meet technical requirements. The quality of pressed piles is usually more stable and easier to control than <a href=\"https:\/\/lethycorp.com\/en\/\">pile.<\/a> For high-rise buildings built on weak geological foundations such as District 2 and District 7, bored piles are often used because they can bear a larger load.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Contact information:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Address:<\/strong>\u00a0No. 12, Street 27, Van Phuc Urban Area, Hiep Binh Phuoc Ward, Thu Duc City, HCMC<\/li>\n\n\n\n<li><strong>Phone number:\u00a0<mark>0915.611.337 Mr. Phuong or 0915.411.337 Mr. Quan<\/mark><\/strong><\/li>\n\n\n\n<li><strong>Email:<\/strong>\u00a0lethy@lethy.com or lethycorp@gmail.com<\/li>\n\n\n\n<li><strong>Website:\u00a0<\/strong><a href=\"https:\/\/lethycorp.com\/en\/\" target=\"_blank\" rel=\"noreferrer noopener\">Lethycorp.com<\/a><\/li>\n\n\n\n<li><strong>Road Map:<\/strong>\u00a0<strong><a href=\"https:\/\/www.google.com\/maps\/dir\/\/e%CC%81p+c%C6%B0%CC%80+larsen\/data=!4m6!4m5!1m1!4e2!1m2!1m1!1s0x3175281c8ea171f9:0xca93c9e5e65d1604?sa=X&ved=2ahUKEwiCg9HhzOX_AhVZxWEKHZQeA3oQ9Rd6BAg-EAA&hl=vi&ved=2ahUKEwiCg9HhzOX_AhVZxWEKHZQeA3oQ9Rd6BAhNEAU\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">See<\/a><\/strong><\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">Search tags: <span style=\"color: #ff0000;\"><a href=\"https:\/\/lethycorp.com\/en\/?p=49\" target=\"_blank\" rel=\"noopener\"><span style=\"color: #ff0000;\">provide BTC . pile<\/span><\/a>,<a href=\"https:\/\/lethycorp.com\/en\/?p=49\" target=\"_blank\" rel=\"noopener\"><span style=\"color: #ff0000;\">supply square pile<\/span><\/a>,<a href=\"https:\/\/lethycorp.com\/en\/?p=49\" target=\"_blank\" rel=\"noopener\"><span style=\"color: #ff0000;\">round pile supply<\/span><\/a>,<a href=\"https:\/\/lethycorp.com\/en\/?p=49\" target=\"_blank\" rel=\"noopener\"><span style=\"color: #ff0000;\">larsen poles<\/span><\/a>,<a href=\"https:\/\/lethycorp.com\/en\/?p=49\" target=\"_blank\" rel=\"noopener\"><span style=\"color: #ff0000;\">construction kingpost shoring<\/span><\/a>,<a href=\"https:\/\/lethycorp.com\/en\/\"><span style=\"color: #ff0000;\">foundation construction<\/span><\/a><a href=\"https:\/\/lethycorp.com\/en\/\"><span style=\"color: #ff0000;\">,lethycorp pile pressing<\/span><\/a>,\u00a0<a href=\"https:\/\/lethycorp.com\/en\/\"><span style=\"color: #ff0000;\">concrete pile pressing<\/span><\/a>,\u00a0<a href=\"https:\/\/lethycorp.com\/en\/\"><span style=\"color: #ff0000;\">bored pile drilling<\/span><\/a>,\u00a0<a href=\"https:\/\/lethycorp.com\/en\/sn-phm\/283-cu-larsen.html\/\"><span style=\"color: #ff0000;\">larsen&#039;s cunt<\/span><\/a>, c<a href=\"https:\/\/lethycorp.com\/en\/sn-phm\/283-cu-larsen.html\/\"><span style=\"color: #ff0000;\">yes larsen<\/span><\/a>,\u00a0<a href=\"https:\/\/lethycorp.com\/en\/sn-phm\/283-cu-larsen.html\/\"><span style=\"color: #ff0000;\">larsen eps<\/span><\/a><\/span><\/span><\/p>","protected":false},"excerpt":{"rendered":"<p>\u0110\u1ed1i v\u1edbi m\u1ed9t c\u00f4ng tr\u00ecnh x\u00e2y d\u1ef1ng vi\u1ec7c thi c\u00f4ng n\u1ec1n m\u00f3ng l\u00e0 c\u1ef1c k\u1ef3 quan tr\u1ecdng, do \u0111\u00f3 vi\u1ec7c l\u1ef1a ch\u1ecdn gi\u1ea3i ph\u00e1p x\u00e2y d\u1ef1ng n\u1ec1n m\u00f3ng c\u00f4ng tr\u00ecnh d\u00e2n d\u1ee5ng h\u1ee3p l\u00ed c\u0169ng r\u1ea5t c\u1ea7n thi\u1ebft sao cho c\u00f4ng tr\u00ecnh v\u1eabn \u0111\u1ea3m b\u1ea3o kh\u1ea3 n\u0103ng ch\u1ecbu l\u1ef1c, \u0111\u1ea3m b\u1ea3o ti\u1ebfn \u0111\u1ed9 thi c\u00f4ng [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":133,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_uag_custom_page_level_css":"","footnotes":""},"categories":[140],"tags":[],"class_list":["post-137","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-hoi-dap"],"uagb_featured_image_src":{"full":["https:\/\/lethycorp.com\/wp-content\/uploads\/2015\/11\/epcocquan12.jpg",500,330,false],"thumbnail":["https:\/\/lethycorp.com\/wp-content\/uploads\/2015\/11\/epcocquan12-150x150.jpg",150,150,true],"medium":["https:\/\/lethycorp.com\/wp-content\/uploads\/2015\/11\/epcocquan12-300x198.jpg",300,198,true],"medium_large":["https:\/\/lethycorp.com\/wp-content\/uploads\/2015\/11\/epcocquan12.jpg",500,330,false],"large":["https:\/\/lethycorp.com\/wp-content\/uploads\/2015\/11\/epcocquan12.jpg",500,330,false],"1536x1536":["https:\/\/lethycorp.com\/wp-content\/uploads\/2015\/11\/epcocquan12.jpg",500,330,false],"2048x2048":["https:\/\/lethycorp.com\/wp-content\/uploads\/2015\/11\/epcocquan12.jpg",500,330,false],"trp-custom-language-flag":["https:\/\/lethycorp.com\/wp-content\/uploads\/2015\/11\/epcocquan12.jpg",18,12,false],"bigger-recent-post-thumbnail":["https:\/\/lethycorp.com\/wp-content\/uploads\/2015\/11\/epcocquan12.jpg",66,44,false]},"uagb_author_info":{"display_name":"Lethycorp","author_link":"https:\/\/lethycorp.com\/en\/author\/lethycorp"},"uagb_comment_info":0,"uagb_excerpt":"\u0110\u1ed1i v\u1edbi m\u1ed9t c\u00f4ng tr\u00ecnh x\u00e2y d\u1ef1ng vi\u1ec7c thi c\u00f4ng n\u1ec1n m\u00f3ng l\u00e0 c\u1ef1c k\u1ef3 quan tr\u1ecdng, do \u0111\u00f3 vi\u1ec7c l\u1ef1a ch\u1ecdn gi\u1ea3i ph\u00e1p x\u00e2y d\u1ef1ng n\u1ec1n m\u00f3ng c\u00f4ng tr\u00ecnh d\u00e2n d\u1ee5ng h\u1ee3p l\u00ed c\u0169ng r\u1ea5t c\u1ea7n thi\u1ebft sao cho c\u00f4ng tr\u00ecnh v\u1eabn \u0111\u1ea3m b\u1ea3o kh\u1ea3 n\u0103ng ch\u1ecbu l\u1ef1c, \u0111\u1ea3m b\u1ea3o ti\u1ebfn \u0111\u1ed9 thi c\u00f4ng&hellip;","_links":{"self":[{"href":"https:\/\/lethycorp.com\/en\/wp-json\/wp\/v2\/posts\/137","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lethycorp.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lethycorp.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lethycorp.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/lethycorp.com\/en\/wp-json\/wp\/v2\/comments?post=137"}],"version-history":[{"count":0,"href":"https:\/\/lethycorp.com\/en\/wp-json\/wp\/v2\/posts\/137\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lethycorp.com\/en\/wp-json\/wp\/v2\/media\/133"}],"wp:attachment":[{"href":"https:\/\/lethycorp.com\/en\/wp-json\/wp\/v2\/media?parent=137"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lethycorp.com\/en\/wp-json\/wp\/v2\/categories?post=137"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lethycorp.com\/en\/wp-json\/wp\/v2\/tags?post=137"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}