{"id":15664,"date":"2024-08-05T14:21:31","date_gmt":"2024-08-05T07:21:31","guid":{"rendered":"https:\/\/lethycorp.com\/?p=15664"},"modified":"2024-08-05T14:26:58","modified_gmt":"2024-08-05T07:26:58","slug":"cong-tang-ham-exam-2","status":"publish","type":"post","link":"https:\/\/lethycorp.com\/en\/dich-vu\/thi-cong-tang-ham-2024.html","title":{"rendered":"Basement Construction: Effective and Time-Saving Solutions 2024"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Basement construction requires high experience and expertise from contractors and construction units. Lack of correct engineering can lead to serious problems when the project is put into use. In this article, Le Thy Construction will introduce effective and time-saving basement construction methods. Please refer now!<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">1. Basement Construction Method: Excavation First, Construction From Bottom Up<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">This is a traditional method, usually applied to holes that are not too deep.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">According to this method, the construction unit will dig the hole to the depth of the foundation, then proceed with construction from bottom to top. However, this method can cause instability of the excavation wall.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"768\" height=\"1024\" src=\"https:\/\/lethycorp.com\/wp-content\/uploads\/2023\/08\/bason-11-1-768x1024.jpg\" alt=\"\" class=\"wp-image-10267\" title=\"\" srcset=\"https:\/\/lethycorp.com\/wp-content\/uploads\/2023\/08\/bason-11-1-768x1024.jpg 768w, https:\/\/lethycorp.com\/wp-content\/uploads\/2023\/08\/bason-11-1-225x300.jpg 225w, https:\/\/lethycorp.com\/wp-content\/uploads\/2023\/08\/bason-11-1-1152x1536.jpg 1152w, https:\/\/lethycorp.com\/wp-content\/uploads\/2023\/08\/bason-11-1.jpg 1536w\" sizes=\"(max-width: 768px) 100vw, 768px\" \/><\/figure>\n<\/div>\n\n\n<h4 class=\"wp-block-heading\">Advantage:<\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Simple construction<\/li>\n\n\n\n<li>High precision<\/li>\n\n\n\n<li>Architectural and structural solutions are not too complicated<\/li>\n\n\n\n<li>Easy waterproofing and technical network installation<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Defect:<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Can easily cause danger to neighboring structures, especially in crowded construction areas<\/li>\n\n\n\n<li>Construction time is longer than other methods<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">2. Open Tunnel Construction Method<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The open tunnel method is one of the most effective construction methods, not requiring retaining walls or rows to hold the excavation wall. The applicable conditions are that the basement wall must be able to withstand the pressure load of the soil and use barrette pile technology.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Advantage:<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Simple construction<\/li>\n\n\n\n<li>Materials used can be recovered after construction<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Defect:<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Takes up a lot of space in the excavation pit, affecting construction<\/li>\n<\/ul>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img decoding=\"async\" width=\"960\" height=\"540\" src=\"https:\/\/lethycorp.com\/wp-content\/uploads\/2016\/10\/nhamaytheptungho-90.jpg\" alt=\"\" class=\"wp-image-11733\" title=\"\" srcset=\"https:\/\/lethycorp.com\/wp-content\/uploads\/2016\/10\/nhamaytheptungho-90.jpg 960w, https:\/\/lethycorp.com\/wp-content\/uploads\/2016\/10\/nhamaytheptungho-90-300x169.jpg 300w, https:\/\/lethycorp.com\/wp-content\/uploads\/2016\/10\/nhamaytheptungho-90-768x432.jpg 768w\" sizes=\"(max-width: 960px) 100vw, 960px\" \/><figcaption class=\"wp-element-caption\">Construction of bracing system <\/figcaption><\/figure>\n<\/div>\n\n\n<h3 class=\"wp-block-heading\">3. Top-Down Method<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The top-down method is used when construction time is prolonged. The construction unit will work from the top down, and at the same time build the house body from the bottom up, taking the ground as the starting point.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Construction steps:<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Construction of walls in soil and pre-drilled piles<\/li>\n\n\n\n<li>Pour concrete on the ground floor right on the natural ground, the ground floor is placed on the ground wall and basement column.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Advantage:<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Construction progress is quick due to the parallel construction of the body and underground parts<\/li>\n\n\n\n<li>Solve the problem of waterproofing soil walls<\/li>\n\n\n\n<li>There is no need for a system of scaffolding or formwork for the floor beam structure<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Defect:<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Many cracks may appear on the floor beam structure due to the large opening size<\/li>\n\n\n\n<li>Risk of breaching the diaphragm wall causing collapse<\/li>\n\n\n\n<li>Faced with flooding during construction<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Above are the current popular basement construction methods compiled by Hoa Binh Construction. Hopefully this article will help you choose the right construction solution for your project.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Contact information:<\/strong><\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Address:<\/strong>\u00a0No. 12, Street 27, Van Phuc Urban Area, Hiep Binh Phuoc Ward, Thu Duc City, HCMC<\/li>\n\n\n\n<li><strong>Phone number:\u00a0<mark>0915.611.337 Mr. Phuong or 0915.411.337 Mr. Quan<\/mark><\/strong><\/li>\n\n\n\n<li><strong>Email:<\/strong>\u00a0lethy@lethy.com or lethycorp@gmail.com<\/li>\n\n\n\n<li><strong>Website:\u00a0<\/strong><a href=\"https:\/\/lethycorp.com\/en\/\" target=\"_blank\" rel=\"noreferrer noopener\">Lethycorp.com<\/a><\/li>\n\n\n\n<li><strong>Road Map:<\/strong>\u00a0<strong><a href=\"https:\/\/www.google.com\/maps\/dir\/\/e%CC%81p+c%C6%B0%CC%80+larsen\/data=!4m6!4m5!1m1!4e2!1m2!1m1!1s0x3175281c8ea171f9:0xca93c9e5e65d1604?sa=X&ved=2ahUKEwiCg9HhzOX_AhVZxWEKHZQeA3oQ9Rd6BAg-EAA&hl=vi&ved=2ahUKEwiCg9HhzOX_AhVZxWEKHZQeA3oQ9Rd6BAhNEAU\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">See<\/a><\/strong><\/li>\n<\/ol>","protected":false},"excerpt":{"rendered":"<p>Basement construction: effective and time-saving solution. This is the title of this interesting article. The basement is an indispensable part of construction projects, but it requires high experience and expertise from contractors and construction units. So how to construct a basement effectively and save time? This article compiled by Le6 Thy Construction will help you choose the right construction solution for your project. Read more to find out!<\/p>","protected":false},"author":1,"featured_media":10267,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_uag_custom_page_level_css":"","footnotes":""},"categories":[3],"tags":[192,193,46],"class_list":["post-15664","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-dich-vu","tag-thi-cong-ham","tag-thi-cong-ham-2","tag-thi-cong-tang-ham"],"uagb_featured_image_src":{"full":["https:\/\/lethycorp.com\/wp-content\/uploads\/2023\/08\/bason-11-1.jpg",1536,2048,false],"thumbnail":["https:\/\/lethycorp.com\/wp-content\/uploads\/2023\/08\/bason-11-1-150x150.jpg",150,150,true],"medium":["https:\/\/lethycorp.com\/wp-content\/uploads\/2023\/08\/bason-11-1-225x300.jpg",225,300,true],"medium_large":["https:\/\/lethycorp.com\/wp-content\/uploads\/2023\/08\/bason-11-1-768x1024.jpg",640,853,true],"large":["https:\/\/lethycorp.com\/wp-content\/uploads\/2023\/08\/bason-11-1-768x1024.jpg",640,853,true],"1536x1536":["https:\/\/lethycorp.com\/wp-content\/uploads\/2023\/08\/bason-11-1-1152x1536.jpg",1152,1536,true],"2048x2048":["https:\/\/lethycorp.com\/wp-content\/uploads\/2023\/08\/bason-11-1.jpg",1536,2048,false],"trp-custom-language-flag":["https:\/\/lethycorp.com\/wp-content\/uploads\/2023\/08\/bason-11-1.jpg",9,12,false],"bigger-recent-post-thumbnail":["https:\/\/lethycorp.com\/wp-content\/uploads\/2023\/08\/bason-11-1-66x66.jpg",66,66,true]},"uagb_author_info":{"display_name":"admin","author_link":"https:\/\/lethycorp.com\/en\/author\/admin"},"uagb_comment_info":0,"uagb_excerpt":"Thi c\u00f4ng t\u1ea7ng h\u1ea7m: gi\u1ea3i ph\u00e1p hi\u1ec7u qu\u1ea3 v\u00e0 ti\u1ebft ki\u1ec7m th\u1eddi gian. \u0110\u00e2y l\u00e0 ti\u00eau \u0111\u1ec1 c\u1ee7a b\u00e0i vi\u1ebft \u0111\u1ea7y th\u00fa v\u1ecb n\u00e0y. T\u1ea7ng h\u1ea7m l\u00e0 m\u1ed9t ph\u1ea7n kh\u00f4ng th\u1ec3 thi\u1ebfu trong c\u00e1c c\u00f4ng tr\u00ecnh x\u00e2y d\u1ef1ng, nh\u01b0ng n\u00f3 \u0111\u00f2i h\u1ecfi kinh nghi\u1ec7m v\u00e0 chuy\u00ean m\u00f4n cao t\u1eeb nh\u00e0 th\u1ea7u v\u00e0 \u0111\u01a1n v\u1ecb thi&hellip;","_links":{"self":[{"href":"https:\/\/lethycorp.com\/en\/wp-json\/wp\/v2\/posts\/15664","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lethycorp.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lethycorp.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lethycorp.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/lethycorp.com\/en\/wp-json\/wp\/v2\/comments?post=15664"}],"version-history":[{"count":0,"href":"https:\/\/lethycorp.com\/en\/wp-json\/wp\/v2\/posts\/15664\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lethycorp.com\/en\/wp-json\/wp\/v2\/media\/10267"}],"wp:attachment":[{"href":"https:\/\/lethycorp.com\/en\/wp-json\/wp\/v2\/media?parent=15664"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lethycorp.com\/en\/wp-json\/wp\/v2\/categories?post=15664"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lethycorp.com\/en\/wp-json\/wp\/v2\/tags?post=15664"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}