{"id":158,"date":"2023-02-22T02:05:00","date_gmt":"2023-02-21T19:05:00","guid":{"rendered":"https:\/\/lethycorp.com\/?p=158"},"modified":"2023-08-22T15:20:15","modified_gmt":"2023-08-22T08:20:15","slug":"ep-coc-bang-robot-thuy-luc","status":"publish","type":"post","link":"https:\/\/lethycorp.com\/en\/dich-vu\/ep-coc-bang-robot-thuy-luc.html","title":{"rendered":"Pressing concrete piles by hydraulic robot 500T"},"content":{"rendered":"<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"920\" height=\"690\" src=\"https:\/\/lethycorp.com\/wp-content\/uploads\/2023\/02\/roboepcoc.jpg\" alt=\"concrete pile driving robot\" class=\"wp-image-7434\" title=\"\" srcset=\"https:\/\/lethycorp.com\/wp-content\/uploads\/2023\/02\/roboepcoc.jpg 920w, https:\/\/lethycorp.com\/wp-content\/uploads\/2023\/02\/roboepcoc-300x225.jpg 300w, https:\/\/lethycorp.com\/wp-content\/uploads\/2023\/02\/roboepcoc-768x576.jpg 768w\" sizes=\"(max-width: 920px) 100vw, 920px\" \/><figcaption class=\"wp-element-caption\"><strong>concrete pile driving robot<\/strong><\/figcaption><\/figure>\n<\/div>\n\n\n<h1 class=\"wp-block-heading\">Robot-assisted concrete pile driving process<\/h1>\n\n\n\n<h2 class=\"wp-block-heading\"><span style=\"font-size: small; line-height: 1.3em;\">1. Prepare documents related to concrete pile pressing<\/span><\/h2>\n\n\n\n<h4 class=\"wp-block-heading\"><span style=\"font-size: small;\">1.1<span style=\"line-height: 1.3em;\">. Personnel profile:<\/span><\/span><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">\u2013 Compile a list of workers and staff participating in the construction.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">\u2013 Conduct health check-ups and provide occupational safety training for workers participating in the construction project.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">\u2013 Prepare and submit a list of staff members who will work directly with the Investor and relevant parties.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em><span style=\"font-size: small;\"> <span style=\"text-decoration: underline;\">Unified form:<\/span><\/span><\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">\u2013 Prepare and submit sample documents and official letters for use during the construction process.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">\u2013 Prepare and submit a detailed construction schedule for approval. (attached)<\/span><\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><span style=\"font-size: small;\">1.2. Construction technical design documents:<\/span><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">\u2013 Continuously check all drawings used throughout the construction period.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">\u2013 Prepare and submit material samples before construction begins.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">\u2013 Prepare and submit detailed construction methods for each item based on the bid documents and actual conditions.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">site before starting construction.<\/span><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span style=\"font-size: small;\">2. Construction site for pressing concrete piles by robot<\/span><\/h2>\n\n\n\n<h4 class=\"wp-block-heading\"><span style=\"font-size: small;\">2.1. Temporary services<\/span><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">\u2013 Electrical system under construction<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">\u2013 Construction site lighting system and site security lights<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">\u2013 Telephone systems and other means of communication.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">\u2013 Water supply piping system under construction.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">\u2013 Contractor signage, project name signs, and other hazard warning signs.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">\u2013 Install fixed barrier systems and provide sufficient movable barriers and hazard warning lights.<\/span><\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><span style=\"font-size: small;\">2.2. Clean the ground<\/span><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">\u2013 Restore and protect the boundary marker system and the surveyed points.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">\u2013 Restore the site to its original condition and retain existing site data throughout the construction process.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">\u2013 Clear and prepare the site before commencing surveying work.<\/span><\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><span style=\"font-size: small;\">3. Construction materials and equipment<\/span><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">All construction equipment gathered to the site must be guaranteed operating procedures and procedures<\/span> <span style=\"font-size: small;\">include :<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">\u2013 500T hydraulic press robot (with inspection certificate).<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">\u2013 Welding machine 3.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">\u2013 Plumb bob, theodolite or total station.<\/span><\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter\"><img decoding=\"async\" width=\"579\" height=\"301\" src=\"https:\/\/lethycorp.com\/wp-content\/uploads\/2020\/05\/danepcocmauxanh1.jpg\" alt=\"Pressing concrete piles by robot \" class=\"wp-image-152\" title=\"\" srcset=\"https:\/\/lethycorp.com\/wp-content\/uploads\/2020\/05\/danepcocmauxanh1.jpg 579w, https:\/\/lethycorp.com\/wp-content\/uploads\/2020\/05\/danepcocmauxanh1-300x156.jpg 300w\" sizes=\"(max-width: 579px) 100vw, 579px\" \/><figcaption class=\"wp-element-caption\">Pressing concrete piles by robot <\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"has-text-align-center wp-block-paragraph\"><em>Figure 1<\/em>. <strong>Robots <a href=\"https:\/\/lethycorp.com\/en\/\">Pile <\/a>\u00a0hydraulic<\/strong><span style=\"font-size: small;\"><\/span><\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter\"><img decoding=\"async\" width=\"562\" height=\"422\" src=\"https:\/\/lethycorp.com\/wp-content\/uploads\/2020\/05\/113untitled.jpg\" alt=\"Ep coc bang thuy luc robot\" class=\"wp-image-153\" title=\"\" srcset=\"https:\/\/lethycorp.com\/wp-content\/uploads\/2020\/05\/113untitled.jpg 562w, https:\/\/lethycorp.com\/wp-content\/uploads\/2020\/05\/113untitled-300x225.jpg 300w\" sizes=\"(max-width: 562px) 100vw, 562px\" \/><figcaption class=\"wp-element-caption\">Ep coc bang thuy luc robot<\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">Figure 2. Operation of Hydraulic Piling Robot<span style=\"line-height: 1.3em;\"><span style=\"font-size: small;\"><\/span><\/span><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span style=\"font-size: small;\">4. Technical method of driving reinforced concrete piles using a hydraulic pile driver robot.<\/span><\/h2>\n\n\n\n<h4 class=\"wp-block-heading\"><span style=\"font-size: small;\">4.1. Sequence of mass pressing piles<\/span><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">The process of pressing piles in the foundation pit includes the following steps:<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><span style=\"font-size: small;\">a.Prepare <\/span><\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">\u2013 Use steel rods with a diameter of 8 to 10 mm and a length of 30 to 40 cm to drive into the ground at the following locations.<\/span> <span style=\"font-size: small;\">location <span style=\"line-height: 1.3em;\">heart pile to make sign.<\/span><\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">\u2013 Construction plan and movement diagram of the hydraulic pile-driving robot.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\"><strong>b. Pile pressing construction process<\/strong>:<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">+ <strong>Step 1:<\/strong> Gather concrete piles, check pile presses, get ready the necessary tools for preparation\u00a0<em>Pile <\/em><\/span><em><span style=\"font-size: small;\">concrete<\/span><\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\"><strong> + Step 2:<\/strong> Crane piles from the gathering place into the press.<\/span><\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter\"><img loading=\"lazy\" decoding=\"async\" width=\"515\" height=\"473\" src=\"https:\/\/lethycorp.com\/wp-content\/uploads\/2020\/05\/114untitled.jpg\" alt=\"\" class=\"wp-image-154\" title=\"\" srcset=\"https:\/\/lethycorp.com\/wp-content\/uploads\/2020\/05\/114untitled.jpg 515w, https:\/\/lethycorp.com\/wp-content\/uploads\/2020\/05\/114untitled-300x276.jpg 300w\" sizes=\"(max-width: 515px) 100vw, 515px\" \/><figcaption class=\"wp-element-caption\">Concrete piling robot<\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"has-text-align-center wp-block-paragraph\"><span style=\"font-size: small;\"><\/span><\/p>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\"><span style=\"font-size: small;\">Figure 3. Lifting piles to the press robot<\/span><\/p>\n\n\n\n<p class=\"has-text-align-left wp-block-paragraph\"><span style=\"font-size: small;\"><strong style=\"font-size: 12.16px; line-height: 1.3em;\">+ Step 3:<\/strong><span style=\"line-height: 1.3em;\"> Adjust the nose\u00a0<a title=\"Concrete piles\" href=\"https:\/\/lethycorp.com\/en\/?p=49\"><strong>Concrete piles<\/strong><\/a>\u00a0in the correct position of the determined heart, adjust the pile in the vertical direction.<\/span><\/span><\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter\"><img loading=\"lazy\" decoding=\"async\" width=\"408\" height=\"363\" src=\"https:\/\/lethycorp.com\/wp-content\/uploads\/2020\/05\/115untitled.jpg\" alt=\"Concrete piling robot \" class=\"wp-image-155\" title=\"\" srcset=\"https:\/\/lethycorp.com\/wp-content\/uploads\/2020\/05\/115untitled.jpg 408w, https:\/\/lethycorp.com\/wp-content\/uploads\/2020\/05\/115untitled-300x267.jpg 300w\" sizes=\"(max-width: 408px) 100vw, 408px\" \/><figcaption class=\"wp-element-caption\">Concrete piling robot <\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"has-text-align-center wp-block-paragraph\"><span style=\"font-size: small;\"><\/span><\/p>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\"><span style=\"line-height: 15.808px;\"><span style=\"font-size: small;\">Figure 4. Pile alignment<\/span><\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\"><strong> + Step 4: <\/strong>Start the press and start the first press stroke.<\/span><\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter\"><img loading=\"lazy\" decoding=\"async\" width=\"382\" height=\"386\" src=\"https:\/\/lethycorp.com\/wp-content\/uploads\/2020\/05\/116untitled.jpg\" alt=\"\" class=\"wp-image-156\" title=\"\" srcset=\"https:\/\/lethycorp.com\/wp-content\/uploads\/2020\/05\/116untitled.jpg 382w, https:\/\/lethycorp.com\/wp-content\/uploads\/2020\/05\/116untitled-100x100.jpg 100w, https:\/\/lethycorp.com\/wp-content\/uploads\/2020\/05\/116untitled-297x300.jpg 297w\" sizes=\"(max-width: 382px) 100vw, 382px\" \/><\/figure>\n<\/div>\n\n\n<p class=\"has-text-align-center wp-block-paragraph\"><span style=\"font-size: small;\"><\/span><\/p>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\"><span style=\"line-height: 15.808px;\"><span style=\"font-size: small;\">Figure 5. Carrying out pressing<\/span><\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\"><strong> + Step 5: <\/strong>Continue pressing until the end of the first pile, put the second pile in place, adjust the two ends of the pile to match<\/span> <span style=\"font-size: small;\">and soldering.<\/span><\/p>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\"><span style=\"font-size: small;\">\u00a0<\/span><\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter\"><img loading=\"lazy\" decoding=\"async\" width=\"368\" height=\"388\" src=\"https:\/\/lethycorp.com\/wp-content\/uploads\/2020\/05\/117untitled.jpg\" alt=\"\" class=\"wp-image-157\" title=\"\" srcset=\"https:\/\/lethycorp.com\/wp-content\/uploads\/2020\/05\/117untitled.jpg 368w, https:\/\/lethycorp.com\/wp-content\/uploads\/2020\/05\/117untitled-285x300.jpg 285w\" sizes=\"(max-width: 368px) 100vw, 368px\" \/><\/figure>\n<\/div>\n\n\n<p class=\"has-text-align-center wp-block-paragraph\"><span style=\"font-size: small;\"><\/span><\/p>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\"><span style=\"line-height: 15.808px; text-align: -webkit-center;\"><span style=\"font-size: small;\">Figure 6. Pressing the remaining pile segments<\/span><\/span><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span style=\"font-size: small;\">Continue pressing until the pile tip reaches the design depth.<\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><span style=\"font-size: small;\">\u2013 <span style=\"text-decoration: underline;\">Stop pressing piles is applied in the following cases:<\/span><\/span><\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">+ The pile tip reaches the design depth and the pile head pressure is not less than P<sub>min<\/sub>.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">+ If the pile tip has not reached the design depth, stop pressing the pile when the pile head pressure is not less than P<sub>min <\/sub><\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">+ If the pile tip reaches the design level and the pile pressure is less than P<sub>min<\/sub> then pile pressing continues until the pressure reaches P .<sub>min<\/sub><\/span> <span style=\"font-size: small;\">The construction unit will notify the Supervision Consultant, the Investor, and the Design Consultant when there is a difference between the value of pressure and<\/span><span style=\"font-size: small; line-height: 1.3em;\"> depth of pile pressing to have a solution, when necessary, do additional soil surveys, do test tests to have a basis for treatment conclusions.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">Piles that are excessively inclined (greater than 1%), piles that are not driven properly due to encountering foreign objects such as sand pockets or unusually hard clay layers, or piles that are broken... are all considered problematic. <\/span><span style=\"font-size: small; line-height: 1.3em;\">must be handled by pulling up and pressing again or adding new piles (designated by design).<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">Use appropriate drilling methods to remove foreign objects, penetrate through sand pockets, hard clay layers, etc. When the pile driving force reaches the design value but cannot go any further, while the driving force acting on the pile continues to increase beyond the design value. <\/span><span style=\"font-size: small; line-height: 1.3em;\">maximum overpressure (P<\/span><sub style=\"line-height: 1.3em;\">ep<\/sub><span style=\"font-size: small; line-height: 1.3em;\">)<\/span><sub style=\"line-height: 1.3em;\">max<\/sub><span style=\"font-size: small; line-height: 1.3em;\"> then before stopping the pressure, use valve to keep the maintaining force (P<\/span><sub style=\"line-height: 1.3em;\">ep<\/sub><span style=\"font-size: small; line-height: 1.3em;\">)<\/span><sub style=\"line-height: 1.3em;\">max<\/sub><span style=\"font-size: small; line-height: 1.3em;\"> within 5 minutes.<\/span><span style=\"font-size: small;\">In case the press does not have a retaining valve, it must be pressed three to five times with the pressure (P<sub>max<\/sub>).<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\"><strong>c. Tolerance<\/strong>:<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">At the height of the bottom of the pile head, the error must not exceed 75mm compared to the design position, the inclination of the pile is not more than 1%. <\/span><span style=\"font-size: small; line-height: 1.3em;\">(according to TCXD 9394:2012).<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><span style=\"font-size: small;\">d. Report on the history of pile pressing. <\/span><\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">\u2013 The pile driving record must be documented during the construction process and include the following information:<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">+ Date of pile casting.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">+ Number of piles, location and size of piles.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">+ Pile pressing depth, number of piles and pile joints.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">+ Pressing device, capacity of pressing, jacking stroke, piston area, oil flow, maximum oil pump pressure.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">+ Pressure to stop piling.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">+ Pillar head gasket type.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">+ Order of pressing piles in the group.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">+ Technical problems hindering the pile driving as designed, errors in position and inclination.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">+ Name of staff supervising the construction team leader.<\/span><\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><span style=\"font-size: small;\">5. Traffic management on construction site<\/span><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">\u2013 All operations must be carried out easily and safely for both equipment and workers. Unauthorized personnel are prohibited.<\/span> <span style=\"font-size: small;\">operated under the rotation of the device.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">\u2013 No unauthorized personnel are allowed to enter the construction area. Security personnel must be present around the monitoring equipment installation area to avoid any potential interference from the equipment.<\/span><\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><span style=\"font-size: small;\">6. Pre-acceptance inspection<\/span><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">After completing the pile pressing of the whole project, the parties organize the inspection and acceptance at the construction site in accordance with regulations,<\/span> <span style=\"font-size: small;\">XDCB sequence.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">Records and documents include:<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">+ Profile quality pile.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">+ Diary of pile pressing.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">+ As-built drawing of piles.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">+ Minutes of acceptance.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">+ Other relevant documents as prescribed.<\/span><\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><span style=\"font-size: small;\">7. Troubleshooting measures<\/span><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\"><em><span style=\"font-size: small;\"> During construction, unexpected incidents may occur, the Contractor confirms to eliminate as far as possible all the <\/span><\/em><em><span style=\"font-size: small;\">risk of an accident.<\/span><\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">\u2013 To effectively resolve these issues without affecting the quality and progress of the project requires:<\/span> <span style=\"font-size: small;\">close cooperation between the units participating in the construction and the project management agencies.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">Our contractor will carry out the troubleshooting work in the following order:<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">\u2013 Prepare a report when an incident occurs.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">\u2013 Preliminary assessment of the incident by stakeholders.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">\u2013 We request that the investor convene a meeting of all relevant parties to discuss solutions and the timeline for resolving the issue.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">\u2013 Prepare and schedule the implementation of solutions in accordance with the decisions of the relevant authorities.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">\u2013 Implement incident resolution.<\/span><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-size: small;\">\u2013 Evaluation and lessons learned<\/span><\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><span style=\"font-size: small;\">8. Conclusion<\/span><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\"><em><span style=\"font-size: small;\"> With the available capacity and experience of a professional contractor, with a team of staff and workers who are trained and step by step trained through the construction of large projects across the country, with full capabilities complete<\/span><\/em> <em><span style=\"font-size: small;\">Good works with high quality with the fastest progress and absolute safety.<\/span><\/em><\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"ftoc-heading-4\">Contact us<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">If you are in need of building or constructing a factory, please contact us to receive detailed advice and quotation. We will listen and understand your requirements and ensure the best solution.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Contact information:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Address:<\/strong>\u00a0No. 12, Street 27, Van Phuc Urban Area, Hiep Binh Phuoc Ward, Thu Duc City, HCMC<\/li>\n\n\n\n<li><strong>Phone number: 0915.611.337 Mr. Phuong Or 0915.411.337 Mr Quan<\/strong><\/li>\n\n\n\n<li><strong>Email:<\/strong>\u00a0lethy@lethy.com or lethycorp@gmail.com<\/li>\n\n\n\n<li><strong>Website:\u00a0<\/strong><a href=\"https:\/\/lethycorp.com\/en\/\" target=\"_blank\" rel=\"noreferrer noopener\">Lethycorp.com<\/a><\/li>\n\n\n\n<li><strong>Road Map:<\/strong>\u00a0<strong><a href=\"https:\/\/www.google.com\/maps\/dir\/\/e%CC%81p+c%C6%B0%CC%80+larsen\/data=!4m6!4m5!1m1!4e2!1m2!1m1!1s0x3175281c8ea171f9:0xca93c9e5e65d1604?sa=X&ved=2ahUKEwiCg9HhzOX_AhVZxWEKHZQeA3oQ9Rd6BAg-EAA&hl=vi&ved=2ahUKEwiCg9HhzOX_AhVZxWEKHZQeA3oQ9Rd6BAhNEAU\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">See<\/a><\/strong><\/li>\n<\/ul>","protected":false},"excerpt":{"rendered":"<p>Quy tr\u00ecnh thi c\u00f4ng \u00e9p c\u1ecdc b\u00ea t\u00f4ng\u00a0 b\u1eb1ng robot 1. Chu\u1ea9n b\u1ecb t\u00e0i li\u1ec7u li\u00ean quan \u0111\u00ea\u0301n e\u0301p co\u0323c b\u00ea t\u00f4ng 1.1. L\u1eadp h\u1ed3 s\u01a1 nh\u00e2n s\u1ef1: \u2013 L\u1eadp danh s\u00e1ch c\u00e1n b\u1ed9 c\u00f4ng nh\u00e2n tham gia thi c\u00f4ng \u2013 Kh\u00e1m s\u1ee9c kho\u1ebb, hu\u1ea5n luy\u1ec7n ATL\u0110 cho c\u00f4ng nh\u00e2n tham gia thi c\u00f4ng. \u2013 [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":7434,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_uag_custom_page_level_css":"","footnotes":""},"categories":[3],"tags":[],"class_list":["post-158","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-dich-vu"],"uagb_featured_image_src":{"full":["https:\/\/lethycorp.com\/wp-content\/uploads\/2023\/02\/roboepcoc.jpg",920,690,false],"thumbnail":["https:\/\/lethycorp.com\/wp-content\/uploads\/2023\/02\/roboepcoc-150x150.jpg",150,150,true],"medium":["https:\/\/lethycorp.com\/wp-content\/uploads\/2023\/02\/roboepcoc-300x225.jpg",300,225,true],"medium_large":["https:\/\/lethycorp.com\/wp-content\/uploads\/2023\/02\/roboepcoc-768x576.jpg",640,480,true],"large":["https:\/\/lethycorp.com\/wp-content\/uploads\/2023\/02\/roboepcoc.jpg",640,480,false],"1536x1536":["https:\/\/lethycorp.com\/wp-content\/uploads\/2023\/02\/roboepcoc.jpg",920,690,false],"2048x2048":["https:\/\/lethycorp.com\/wp-content\/uploads\/2023\/02\/roboepcoc.jpg",920,690,false],"trp-custom-language-flag":["https:\/\/lethycorp.com\/wp-content\/uploads\/2023\/02\/roboepcoc.jpg",16,12,false],"bigger-recent-post-thumbnail":["https:\/\/lethycorp.com\/wp-content\/uploads\/2023\/02\/roboepcoc-66x66.jpg",66,66,true]},"uagb_author_info":{"display_name":"Lethycorp","author_link":"https:\/\/lethycorp.com\/en\/author\/lethycorp"},"uagb_comment_info":0,"uagb_excerpt":"Quy tr\u00ecnh thi c\u00f4ng \u00e9p c\u1ecdc b\u00ea t\u00f4ng\u00a0 b\u1eb1ng robot 1. Chu\u1ea9n b\u1ecb t\u00e0i li\u1ec7u li\u00ean quan \u0111\u00ea\u0301n e\u0301p co\u0323c b\u00ea t\u00f4ng 1.1. L\u1eadp h\u1ed3 s\u01a1 nh\u00e2n s\u1ef1: \u2013 L\u1eadp danh s\u00e1ch c\u00e1n b\u1ed9 c\u00f4ng nh\u00e2n tham gia thi c\u00f4ng \u2013 Kh\u00e1m s\u1ee9c kho\u1ebb, hu\u1ea5n luy\u1ec7n ATL\u0110 cho c\u00f4ng nh\u00e2n tham gia thi c\u00f4ng. \u2013&hellip;","_links":{"self":[{"href":"https:\/\/lethycorp.com\/en\/wp-json\/wp\/v2\/posts\/158","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lethycorp.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lethycorp.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lethycorp.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/lethycorp.com\/en\/wp-json\/wp\/v2\/comments?post=158"}],"version-history":[{"count":0,"href":"https:\/\/lethycorp.com\/en\/wp-json\/wp\/v2\/posts\/158\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lethycorp.com\/en\/wp-json\/wp\/v2\/media\/7434"}],"wp:attachment":[{"href":"https:\/\/lethycorp.com\/en\/wp-json\/wp\/v2\/media?parent=158"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lethycorp.com\/en\/wp-json\/wp\/v2\/categories?post=158"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lethycorp.com\/en\/wp-json\/wp\/v2\/tags?post=158"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}