{"id":50,"date":"2020-05-22T17:00:00","date_gmt":"2020-05-22T10:00:00","guid":{"rendered":"https:\/\/lethycorp.com\/?p=50"},"modified":"2023-08-25T10:31:59","modified_gmt":"2023-08-25T03:31:59","slug":"structure-of-form-of-concrete-structure","status":"publish","type":"post","link":"https:\/\/lethycorp.com\/en\/san-pham\/coc-btct-khuon-coppha-dinh-hinh.html","title":{"rendered":"Reinforced Concrete Piles Cast Using 3-Sided Shaped Coppha Mold"},"content":{"rendered":"<p class=\"wp-block-paragraph\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: small;\">\u00a0<\/span><\/p>\n\n\n\n<figure class=\"wp-block-image\"><img fetchpriority=\"high\" decoding=\"async\" width=\"853\" height=\"480\" src=\"https:\/\/lethycorp.com\/wp-content\/uploads\/2020\/05\/baicocvuonglethy.jpg\" alt=\"\" class=\"wp-image-38\" title=\"\" srcset=\"https:\/\/lethycorp.com\/wp-content\/uploads\/2020\/05\/baicocvuonglethy.jpg 853w, https:\/\/lethycorp.com\/wp-content\/uploads\/2020\/05\/baicocvuonglethy-600x338.jpg 600w, https:\/\/lethycorp.com\/wp-content\/uploads\/2020\/05\/baicocvuonglethy-300x169.jpg 300w, https:\/\/lethycorp.com\/wp-content\/uploads\/2020\/05\/baicocvuonglethy-768x432.jpg 768w\" sizes=\"(max-width: 853px) 100vw, 853px\" \/><\/figure>\n\n\n\n<h6 class=\"wp-block-heading\">Reinforced Concrete Piles Cast Using 3-Sided Shaped Coppha Mold<\/h6>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td><span style=\"font-family: arial, helvetica, sans-serif; font-size: small; color: #ff0000;\">1. Cast pile type:<\/span> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small; color: #000000;\">According to the detailed pile design,\u00a0<a href=\"https:\/\/lethycorp.com\/en\/\" target=\"_blank\" rel=\"noopener\"><span style=\"color: #000000;\">RC piles<\/span><\/a><\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small;\">+ Tip pile type (C1)<\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small;\">+ Body pile type (C2)<\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small; color: #ff0000;\">2. Prepare the pile casting ground:<\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: medium;\"><span style=\"font-size: small;\">With an area of 9,400 m<sup>2\u00a0<\/sup>Land used, of which: - Steel processing factory area is 1,200 m<sup>2<\/sup>\u00a0with full machinery and equipment for production such as cutting, bending, punching, corrugated iron cutting, compressing machines... - Yard area of 8,200 m<sup>2<\/sup>\u00a0production, molding and drying of concrete; More than 200 sets of shaped pile casting molds made of steel and T-gauge glass<\/span><span style=\"font-size: small;\">from 250x250x12000 to 500x500x12000. Before pouring concrete, the surface must be cleaned and all piles of other constructions must be gathered in one position at the inner corner of the yard.<\/span><\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small;\">\u00a0<\/span><span style=\"font-family: arial, helvetica, sans-serif; font-size: small; color: #ff0000;\">3. Equipment used for casting reinforced concrete piles:<\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small;\">\u2013 500-liter concrete mixer from China<\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small;\">\u2013 Water pumps from South Korea and China<\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small;\">\u2013 Vietnamese welding machines<\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small;\">\u2013 A-frame crane Q = 5 tons.<\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small;\">\u2013 Chinese vibratory compactors<\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small;\">\u2013 Chinese hair cutting and bending machine<\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small;\">\u2013 Steel formwork of various types: 200, 250, 300, 350<\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small; color: #ff0000;\">4. List of main supplies:<\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small;\">\u2013 Cement: Joint ventures, Ha Tien, Sao Mai\u2026.<\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small;\">\u2013 Stirrup steel: as per design.<\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small;\">\u2013 Main steel: according to design<\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small;\">\u2013 Steel plates: according to design<\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small;\">\u2013 Yellow sand: Dong Nai\u2026.<\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small;\">\u2013 1x2 crushed stone: as required<\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small;\">\u2013 Water: Use well water that has been filtered through a system that has undergone testing and proven stable for long-term use.<\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small; color: #ff0000;\"><strong>5. Formwork work:<\/strong><\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small;\">\u2013 Use prefabricated steel formwork with all necessary accessories such as clamps and supports. The formwork surface must be flat and coated with a layer of waste oil to prevent sticking. The surface of the pile casting yard must be flat, smooth, and coated with waste oil to prevent sticking.<\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small;\">\u2013 Steel formwork must be perpendicular to the foundation surface, secured by a system of shaped clamps and adjusted in size using wooden wedges, with a clamp spacing of 1.5 to 2 meters.<\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small;\">\u2013 The end caps of the formwork must be made of steel or wood, planed smooth to create a flat surface, and must be perpendicular to the formwork on both sides.<\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small; color: #ff0000;\"><strong>6. Reinforcement fabrication and erection work:<\/strong><\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small;\">\u2013 The main reinforcing steel is straightened and cut to the correct size, ensuring that the steel is of the correct type as specified in the design.<\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small;\">\u2013 Stirrup reinforcement is straightened using a winch, cut using a bending machine, a bending table, or a machine to the correct design dimensions, and the spacing of the stirrups is as required by the design.<\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small;\">\u2013 The stirrup steel is connected to the main steel using 1 mm thick steel wire.<\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small;\">\u2013 The main steel is connected to the pile head detail box by welding, using Viet Duc welding rods.<\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small;\">\u2013 The pile head housing is machined to ensure that all four edges of the pile face lie on the same plane, guaranteeing a square shape according to the design dimensions.<\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small;\">\u2013 The pile reinforcement steel is fabricated and assembled in individual cages according to the design and is inspected by supervisor A before being installed into the formwork.<\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small; color: #ff0000;\"><strong>7. Concrete piles:<\/strong><\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small;\">\u2013 Concrete for casting piles will be mixed using a 500-liter mixer, following the designed concrete mix proportions.<\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small;\">\u2013 The speed of the concrete mixer and crane moving to the concrete pouring location (round trip) is \u00b3 8 minutes.<\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small;\">\u2013 Before mixing concrete, ensure that the sand and aggregate are clean and free of impurities, and that the particle size distribution is tested. Use a 1.5 KW vibratory tamper to compact the concrete piles, compacting the concrete as it is poured. Use a trowel to finish the surface.<\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small;\">\u2013 The outer surface of the pile must be flat and smooth. The pile head surface must be smooth and perpendicular to the longitudinal axis of the pile. For the pile tip sections, the pile tip must coincide with the center of the pile.<\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small;\">\u2013 During the concrete pouring process for piles, samples must be regularly taken for testing according to regulations.<\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small;\">\u2013 Curing of concrete piles after casting is carried out using natural curing methods. Approximately 4-6 hours after pouring the concrete, when the surface of the concrete has set and does not sink when pressed by hand, watering is carried out for curing. The curing period is continuous for a minimum of 3-7 days, depending on whether the weather is humid or dry. In the following days, the structure is always kept moist.<\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small;\">\u2013 When the concrete reaches 25% of its design strength (after 12-16 days).<sup>H\u00a0<\/sup>according to the prescribed experiment) then proceed to dismantle the formwork. Use red paint to write on the pile head and face: name of pile section (C1; C2), date of pile casting.<\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small; color: #ff0000;\"><strong>8. Measures to ensure quality and progress<\/strong>:<\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small;\">Construction complies with normative processes in basic construction, ensuring Vietnamese standards according to the following types of work:<\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small;\">\u2013 TCVN 4055 \u2013 1985: Construction organization.<\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small;\">\u2013 TCVN 4453-1995: Monolithic concrete and reinforced concrete structures \u2013 Construction and acceptance regulations.<\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small;\">\u2013 TCVN 5592-1991: Heavy concrete \u2013 Requirements for natural curing<\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small;\">\u2013 TCVN 4252 \u2013 1988: Construction and Acceptance Regulations \u2013 Procedures for preparing construction design documents.<\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small;\">\u2013 TCVN 1770 \u2013 1986: Construction sand \u2013 Technical requirements<\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small;\">\u2013 TCVN 1771 \u2013 1986: Construction crushed stone \u2013 Technical requirements<\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small;\">\u2013 TCVN 1651 \u2013 1985: Construction steel \u2013 Technical requirements<\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small;\">\u2013 TCVN 4586 \u2013 1987: Water for concrete and mortar \u2013 Technical requirements<\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small;\">During the construction process, the unit strictly implements the acceptance process as follows:<\/span><\/p> <p><span style=\"font-family: arial, helvetica, sans-serif; font-size: small;\">\u2013 Steel reinforcement inspection \u2013 Formwork inspection \u2013 Concrete pouring.<\/span><\/p> <\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Contact information:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Address:<\/strong>\u00a0No. 12, Street 27, Van Phuc Urban Area, Hiep Binh Phuoc Ward, Thu Duc City, HCMC<\/li>\n\n\n\n<li><strong>Phone number:\u00a0<mark>0915.611.337 Mr. Phuong or 0915.411.337 Mr. Quan<\/mark><\/strong><\/li>\n\n\n\n<li><strong>Email:<\/strong>\u00a0lethy@lethy.com or lethycorp@gmail.com<\/li>\n\n\n\n<li><strong>Website:\u00a0<\/strong><a href=\"https:\/\/lethycorp.com\/en\/\" target=\"_blank\" rel=\"noreferrer noopener\">Lethycorp.com<\/a><\/li>\n\n\n\n<li><strong>Road Map:<\/strong>\u00a0<strong><a href=\"https:\/\/www.google.com\/maps\/dir\/\/e%CC%81p+c%C6%B0%CC%80+larsen\/data=!4m6!4m5!1m1!4e2!1m2!1m1!1s0x3175281c8ea171f9:0xca93c9e5e65d1604?sa=X&ved=2ahUKEwiCg9HhzOX_AhVZxWEKHZQeA3oQ9Rd6BAg-EAA&hl=vi&ved=2ahUKEwiCg9HhzOX_AhVZxWEKHZQeA3oQ9Rd6BAhNEAU\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">See<\/a><\/strong><\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: small;\"><span style=\"line-height: 18px; color: #000000;\">Tags :<span style=\"color: #ff0000;\"><a style=\"outline: none; color: #d00000;\" target=\"_blank\" rel=\"noopener\"><span style=\"color: #ff0000;\"> Pile<\/span><\/a>,\u00a0<a style=\"outline: none; color: #d00000;\" target=\"_blank\" rel=\"noopener\"><span style=\"color: #ff0000;\">ep coc<\/span><\/a>,\u00a0<a style=\"outline: none; color: #d00000;\" target=\"_blank\" rel=\"noopener\"><span style=\"color: #ff0000;\">concrete pile pressing<\/span><\/a>,\u00a0<a style=\"outline: none; color: #d00000;\" target=\"_blank\" rel=\"noopener\"><span style=\"color: #ff0000;\">The cocoon is complete<\/span><\/a>,\u00a0<a style=\"outline: none; color: #d00000;\" target=\"_blank\" rel=\"noopener\"><span style=\"color: #ff0000;\">BTC pile pressing<\/span><\/a>,\u00a0<a style=\"outline: none; color: #d00000;\" target=\"_blank\" rel=\"noopener\"><span style=\"color: #ff0000;\">casting concrete piles<\/span><\/a>,\u00a0<a style=\"outline: none; color: #d00000;\" target=\"_blank\" rel=\"noopener\"><span style=\"color: #ff0000;\">pressed iron piles<\/span><\/a>,\u00a0<a style=\"outline: none; color: #d00000;\" target=\"_blank\" rel=\"noopener\"><span style=\"color: #ff0000;\">HCM pile pressing,\u00a0<\/span><\/a><\/span><\/span><span style=\"color: #ff0000;\"><a style=\"font-size: 12.16px; line-height: 1.3em;\" href=\"https:\/\/lethycorp.com\/en\/?p=49\" target=\"_blank\" rel=\"noopener\"><span style=\"color: #ff0000;\">provide BTC . pile<\/span><\/a><span style=\"line-height: 1.3em;\">,\u00a0<\/span><a style=\"font-size: 12.16px; line-height: 1.3em;\" href=\"https:\/\/lethycorp.com\/en\/?p=49\" target=\"_blank\" rel=\"noopener\"><span style=\"color: #ff0000;\">supply square pile<\/span><\/a><span style=\"line-height: 1.3em;\">,\u00a0<\/span><a style=\"font-size: 12.16px; line-height: 1.3em;\" href=\"https:\/\/lethycorp.com\/en\/?p=49\" target=\"_blank\" rel=\"noopener\"><span style=\"color: #ff0000;\">round pile supply<\/span><\/a><span style=\"line-height: 1.3em;\">,\u00a0<\/span><a style=\"font-size: 12.16px; line-height: 1.3em;\" href=\"https:\/\/lethycorp.com\/en\/?p=49\" target=\"_blank\" rel=\"noopener\"><span style=\"color: #ff0000;\">larsen poles<\/span><\/a><span style=\"line-height: 1.3em;\">,\u00a0<\/span><a style=\"font-size: 12.16px; line-height: 1.3em;\" href=\"https:\/\/lethycorp.com\/en\/?p=49\" target=\"_blank\" rel=\"noopener\"><span style=\"color: #ff0000;\">construction kingpost shoring<\/span><\/a><span style=\"line-height: 1.3em;\">,\u00a0<\/span><strong style=\"font-size: 12.16px; line-height: 1.3em;\"><a href=\"https:\/\/lethycorp.com\/en\/\"><span style=\"color: #ff0000;\">foundation construction<\/span><\/a><\/strong><a style=\"font-size: 12.16px; line-height: 1.3em;\" href=\"https:\/\/lethycorp.com\/en\/\"><span style=\"color: #ff0000;\">, pile pressing lethycorp<\/span><\/a><\/span><\/span><\/p>","protected":false},"excerpt":{"rendered":"<p>\u00a0 C\u1ecdc BTCT \u0110\u00fac B\u1eb1ng Khu\u00f4n Coppha \u0110\u1ecbnh H\u00ecnh 3 M\u1eb7t 1. Lo\u1ea1i c\u1ecdc \u0111\u00fac : Theo thi\u1ebft k\u1ebf chi ti\u1ebft c\u1ecdc,\u00a0c\u1ecdc BTCT + Lo\u1ea1i c\u1ecdc m\u0169i (C1) + Lo\u1ea1i c\u1ecdc th\u00e2n\u00a0 (C2) 2. Chu\u1ea9n b\u1ecb m\u1eb7t b\u1eb1ng \u0111\u00fac c\u1ecdc: V\u1edbi di\u1ec7n t\u00edch 9.400 m2\u00a0\u0111\u1ea5t s\u1eed d\u1ee5ng, trong \u0111\u00f3:- Di\u1ec7n t\u00edch nh\u00e0 x\u01b0\u1edfng s\u1ea3n xu\u1ea5t [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":38,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_uag_custom_page_level_css":"","footnotes":""},"categories":[141],"tags":[],"class_list":["post-50","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-san-pham"],"uagb_featured_image_src":{"full":["https:\/\/lethycorp.com\/wp-content\/uploads\/2020\/05\/baicocvuonglethy.jpg",853,480,false],"thumbnail":["https:\/\/lethycorp.com\/wp-content\/uploads\/2020\/05\/baicocvuonglethy-150x150.jpg",150,150,true],"medium":["https:\/\/lethycorp.com\/wp-content\/uploads\/2020\/05\/baicocvuonglethy-300x169.jpg",300,169,true],"medium_large":["https:\/\/lethycorp.com\/wp-content\/uploads\/2020\/05\/baicocvuonglethy-768x432.jpg",640,360,true],"large":["https:\/\/lethycorp.com\/wp-content\/uploads\/2020\/05\/baicocvuonglethy.jpg",640,360,false],"1536x1536":["https:\/\/lethycorp.com\/wp-content\/uploads\/2020\/05\/baicocvuonglethy.jpg",853,480,false],"2048x2048":["https:\/\/lethycorp.com\/wp-content\/uploads\/2020\/05\/baicocvuonglethy.jpg",853,480,false],"trp-custom-language-flag":["https:\/\/lethycorp.com\/wp-content\/uploads\/2020\/05\/baicocvuonglethy.jpg",18,10,false],"bigger-recent-post-thumbnail":["https:\/\/lethycorp.com\/wp-content\/uploads\/2020\/05\/baicocvuonglethy.jpg",66,37,false]},"uagb_author_info":{"display_name":"Lethycorp","author_link":"https:\/\/lethycorp.com\/en\/author\/lethycorp"},"uagb_comment_info":0,"uagb_excerpt":"\u00a0 C\u1ecdc BTCT \u0110\u00fac B\u1eb1ng Khu\u00f4n Coppha \u0110\u1ecbnh H\u00ecnh 3 M\u1eb7t 1. Lo\u1ea1i c\u1ecdc \u0111\u00fac : Theo thi\u1ebft k\u1ebf chi ti\u1ebft c\u1ecdc,\u00a0c\u1ecdc BTCT + Lo\u1ea1i c\u1ecdc m\u0169i (C1) + Lo\u1ea1i c\u1ecdc th\u00e2n\u00a0 (C2) 2. Chu\u1ea9n b\u1ecb m\u1eb7t b\u1eb1ng \u0111\u00fac c\u1ecdc: V\u1edbi di\u1ec7n t\u00edch 9.400 m2\u00a0\u0111\u1ea5t s\u1eed d\u1ee5ng, trong \u0111\u00f3:- Di\u1ec7n t\u00edch nh\u00e0 x\u01b0\u1edfng s\u1ea3n xu\u1ea5t&hellip;","_links":{"self":[{"href":"https:\/\/lethycorp.com\/en\/wp-json\/wp\/v2\/posts\/50","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lethycorp.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lethycorp.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lethycorp.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/lethycorp.com\/en\/wp-json\/wp\/v2\/comments?post=50"}],"version-history":[{"count":0,"href":"https:\/\/lethycorp.com\/en\/wp-json\/wp\/v2\/posts\/50\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lethycorp.com\/en\/wp-json\/wp\/v2\/media\/38"}],"wp:attachment":[{"href":"https:\/\/lethycorp.com\/en\/wp-json\/wp\/v2\/media?parent=50"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lethycorp.com\/en\/wp-json\/wp\/v2\/categories?post=50"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lethycorp.com\/en\/wp-json\/wp\/v2\/tags?post=50"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}