{"id":804,"date":"2010-10-23T01:09:45","date_gmt":"2010-10-22T18:09:45","guid":{"rendered":"https:\/\/lethycorp.com\/?p=804"},"modified":"2023-08-25T16:41:17","modified_gmt":"2023-08-25T09:41:17","slug":"collect-your-wish-to-coc","status":"publish","type":"post","link":"https:\/\/lethycorp.com\/en\/hoi-dap\/thu-tai-mong-coc.html","title":{"rendered":"Outline of pile foundation load test"},"content":{"rendered":"<p><span style=\"color: #000000;\">The pile foundation load test is to determine the limit load according to the soil foundation of the pile corresponding to the expected design depth, thereby officially deciding the mass cast pile length and pile layout diagram. Load testing of pile foundations is carried out according to the following content:<\/span><\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"705\" height=\"423\" src=\"https:\/\/lethycorp.com\/wp-content\/uploads\/2011\/05\/coc-ly-tam-lethy3.jpg\" alt=\"\" class=\"wp-image-5551\" title=\"\" srcset=\"https:\/\/lethycorp.com\/wp-content\/uploads\/2011\/05\/coc-ly-tam-lethy3.jpg 705w, https:\/\/lethycorp.com\/wp-content\/uploads\/2011\/05\/coc-ly-tam-lethy3-300x180.jpg 300w\" sizes=\"(max-width: 705px) 100vw, 705px\" \/><\/figure>\n<\/div>\n\n\n<h6 class=\"wp-block-heading\"><strong>Outline of pile foundation load test<\/strong><\/h6>\n\n\n\n<p><span style=\"text-decoration: underline;\"><span style=\"color: #ff0000; text-decoration: underline;\">1. DYNAMIC TEST<\/span><\/span><br> <span style=\"color: #000000;\">1.1 Number of piles to test the pile foundation load: write the number of test piles, with attached drawings<\/span><br> <span style=\"color: #000000;\">1.2 Pile foundation load test specifications<\/span><br> <span style=\"color: #000000;\"> Pile type: Use M300 reinforced concrete pile, cross section 25 cm x 25 cm<\/span><br> <span style=\"color: #000000;\"> Pile length: L = 24 m, including 2 segments in a combination of 12 m (head segment) + 12 m (nose segment)<\/span><\/p>\n\n\n\n<p><span style=\"color: #000000;\">1.3 Pile tip height: Estimated \u2013 18.80 m<\/span><br> <span style=\"color: #000000;\">1.4 Technical requirements<\/span> when testing the pile foundation load<\/p>\n\n\n\n<p><span style=\"color: #000000;\">Preparation<\/span> for pile foundation load testing<br> <span style=\"color: #000000;\">\u2013 The test pile driving floor must be prepared hard enough so that when driving, the driving platform does not shake, reducing the shock energy of the hammer.<\/span><br> <span style=\"color: #000000;\">\u2013 Hammer type: use impact hammer with falling part weight from 1800 kg to 2500 kg, minimum impact energy is 4000kgm<\/span><br> <span style=\"color: #000000;\">\u2013 Pile quality: piles must be manufactured according to design drawings and must be quality tested before driving<\/span><br> <span style=\"color: #000000;\">Regulations while <\/span>pile foundation load test<\/p>\n\n\n\n<p><span style=\"color: #000000;\">\u2013 When the pile tip is 1 m away from the expected design elevation but the rejection has reached 2mm\/1 stroke<\/span><br> <span style=\"color: #000000;\">\u2013 When the pile tip has reached the expected design height and the rejection reaches 2mm &lt; e \u2264 4mm<\/span><br> <span style=\"color: #000000;\">\u2013 When the pile tip reaches the expected design height but the rejection is still greater than 4mm\/1 stroke, you must continue driving until one of the following two conditions is met:<\/span><\/p>\n\n\n\n<p><span style=\"color: #000000;\">Density e \u2264 4 mm<\/span><br> <span style=\"color: #000000;\"> Maximum additional closing length is 1 m<\/span><br> <\/p>\n\n\n\n<p><span style=\"color: #000000;\">Regulations when <\/span>pile foundation load test<br> <span style=\"color: #000000;\">\u2013 Wait 3 days after finishing driving the pile, hit again with 3 hammer blows, 20 blows each.<\/span><\/p>\n\n\n\n<p> <span style=\"color: #000000;\">\u2013 Conditions for ending the pile foundation load test: Rejection of the pile after reclawing reaches from 2mm to 3mm\/1 stroke. In case the above rejection level is not met, it is necessary to notify Party A and the design agency for coordinated handling.<\/span><\/p>\n\n\n\n<p> <span style=\"color: #000000;\">\u2013 Record all pile driving progress from the time of starting and lowering the pile until the end of the test pile work, under the supervision of a supervision consultant.<\/span><br> <span style=\"color: #000000;\">The implementation of test pile driving will be approved by the competent authority<\/span><\/p>\n\n\n\n<p> <span style=\"text-decoration: underline;\"><span style=\"color: #ff0000; text-decoration: underline;\">2. STATIC TEST<\/span><\/span><br> <span style=\"color: #000000;\">The pile foundation load test aims to determine the limit load according to the soil foundation of the pile corresponding to the expected design depth, thereby officially deciding the mass cast pile length and pile layout diagram. Test pile pressing is carried out according to the following content:<\/span><\/p>\n\n\n\n<p><span style=\"color: #000000;\">2.1 Test method: static test<\/span><br> <span style=\"color: #000000;\">2.2 Test pile<\/span><br> <span style=\"color: #000000;\"> M300 reinforced concrete pile, size 25\u00d725 cm. L=30m (combination of 10 m + 10 m + 10 m nose segment)<\/span><br> <span style=\"color: #000000;\"> Pile structure: as shown in the drawing<\/span><\/p>\n\n\n\n<p><span style=\"color: #000000;\">Piles used for pressing must have a complete factory history, ensuring quality and strength according to the prescribed design.<\/span><br> <span style=\"color: #000000;\"> Pile tip height:<\/span><br> <span style=\"color: #000000;\"> Calculated load capacity of pile Ptt = 30 T<\/span><br> <span style=\"color: #000000;\"> Number of test piles<\/span><\/p>\n\n\n\n<p><span style=\"color: #000000;\">2.3 Test pile location: see attached drawing<\/span><br> <span style=\"color: #000000;\">2.4 Select pressing equipment<\/span><br> <span style=\"color: #000000;\"> Based on the test load of 50 T, a hydraulic pile jacking device with a minimum pile pressing capacity of 70 T will be selected.<\/span><\/p>\n\n\n\n<p><span style=\"color: #000000;\"> The accuracy of the pile head displacement meter is required to be at least 0.01 mm. The pressure gauges must be inspected by a specialized agency immediately before the load test.<\/span><br> <span style=\"color: #000000;\"> The positioning system, jacking and pressing piles must meet the requirements: keep the pile position stable on the ground.<\/span><\/p>\n\n\n\n<p> <span style=\"color: #000000;\">2.5 Sequence of pressing and static testing<\/span><br> <span style=\"color: #000000;\">a) Pressing sequence<\/span><br> <span style=\"color: #000000;\"> Condition for stopping pressing:<\/span><br> <span style=\"color: #000000;\">\u2013 The pile tip reaches the expected design height - 25.75 m and the minimum pressure reaches 50 T<\/span><br> <span style=\"color: #000000;\">\u2013 The pressure is at least 50 T and the pile is lowered into the good soil layer for a distance of at least 1 m (the depth of immersion in good soil is assessed through the jacking pressure: from the moment the jacking pressure suddenly increases, it is expected to be about 40 T or more)<\/span><\/p>\n\n\n\n<p><span style=\"color: #000000;\"> Note:<\/span><br> <span style=\"color: #000000;\">\u2013 The jack and pile positioning system needs to be accurate, adjusted to the center of the pile and not cause horizontal pressure on the pile head.<\/span><br> <span style=\"color: #000000;\">\u2013 Pile pressing and splicing are carried out in accordance with the correct order and requirements in the pile pressing process.<\/span><br> <span style=\"color: #000000;\">\u2013 Record the pressure evolution in each period of 1 m<\/span><br> <span style=\"color: #000000;\">\u2013 When the pile contacts the soil well (force suddenly increases and &gt; 40 T), record the pressure evolution in each 20 cm section.<\/span><\/p>\n\n\n\n<p><span style=\"color: #000000;\">b) Static suicide sequence<\/span><br> <span style=\"color: #000000;\">c\/ Notes<\/span><br> <span style=\"color: #000000;\"> Condition for increasing load level: load is increased by one level if after one hour of observation the pile settlement is less than 0.20mm and gradually decreases after each reading in the above time period.<\/span><\/p>\n\n\n\n<p><span style=\"color: #000000;\">Record the load and settlement during the loading process<\/span><br> <span style=\"color: #000000;\">\u2013 Every 15 minutes during loading time<\/span><br> <span style=\"color: #000000;\">\u2013 Every 30 minutes during loading time from 1 hour to 6 hours<\/span><br> <span style=\"color: #000000;\">\u2013 Every 60 minutes during loading time &gt; 6 hours<\/span><\/p>\n\n\n\n<p><span style=\"color: #000000;\">Record load and settlement during load reduction: Load, settlement and time are recorded immediately after being reduced to the corresponding level and as soon as starting to reduce to the new level.<\/span><br> <span style=\"color: #000000;\"> Unloading conditions<\/span><br> <span style=\"color: #000000;\">\u2013 When the load level reaches 50T and the load holding time is as prescribed<\/span><br> <span style=\"color: #000000;\">\u2013 When at any load level less than 50T, the total settlement caused by the test weight exceeds 45 mm or the settlement after 1 hour of observation after the specified load holding time is greater than 0.2 mm and gradually increases after each reading within the above time period.<span style=\"font-size: xx-small;\"><br> <\/span><\/span><\/p>\n\n\n\n<p><strong>Contact information:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Address:<\/strong>&nbsp;No. 12, Street 27, Van Phuc Urban Area, Hiep Binh Phuoc Ward, Thu Duc City, HCMC<\/li>\n\n\n\n<li><strong>Phone number:&nbsp;<mark>0915.611.337 Mr. Phuong or 0915.411.337 Mr. Quan<\/mark><\/strong><\/li>\n\n\n\n<li><strong>Email:<\/strong>&nbsp;lethy@lethy.com or lethycorp@gmail.com<\/li>\n\n\n\n<li><strong>Website:&nbsp;<\/strong><a href=\"https:\/\/lethycorp.com\/en\/\" target=\"_blank\" rel=\"noreferrer noopener\">Lethycorp.com<\/a><\/li>\n\n\n\n<li><strong>Road Map:<\/strong>&nbsp;<strong><a href=\"https:\/\/www.google.com\/maps\/dir\/\/e%CC%81p+c%C6%B0%CC%80+larsen\/data=!4m6!4m5!1m1!4e2!1m2!1m1!1s0x3175281c8ea171f9:0xca93c9e5e65d1604?sa=X&amp;ved=2ahUKEwiCg9HhzOX_AhVZxWEKHZQeA3oQ9Rd6BAg-EAA&amp;hl=vi&amp;ved=2ahUKEwiCg9HhzOX_AhVZxWEKHZQeA3oQ9Rd6BAhNEAU\" target=\"_blank\" rel=\"noreferrer noopener\">See<\/a><\/strong><\/li>\n<\/ul>","protected":false},"excerpt":{"rendered":"<p>Vi\u1ec7c th\u1eed t\u1ea3i m\u00f3ng c\u1ecdc nh\u1eb1m x\u00e1c \u0111\u1ecbnh t\u1ea3i tr\u1ecdng gi\u1edbi h\u1ea1n theo \u0111\u1ea5t n\u1ec1n c\u1ee7a c\u1ecdc \u1ee9ng v\u1edbi chi\u1ec1u s\u00e2u thi\u1ebft k\u1ebf d\u1ef1 ki\u1ebfn, qua \u0111\u00f3 quy\u1ebft \u0111\u1ecbnh ch\u00ednh th\u1ee9c chi\u1ec1u d\u00e0i c\u1ecdc \u0111\u00fac \u0111\u1ea1i tr\u00e0, s\u01a1 \u0111\u1ed3 b\u1ed1 tr\u00ed c\u1ecdc. vi\u1ec7c th\u1eed t\u1ea3i m\u00f3ng c\u1ecdc ti\u1ebfn h\u00e0nh theo n\u1ed9i dung sau: \u0110\u1ec1 c\u01b0\u01a1ng [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":5550,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_uag_custom_page_level_css":"","footnotes":""},"categories":[140],"tags":[],"class_list":["post-804","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-hoi-dap"],"uagb_featured_image_src":{"full":["https:\/\/lethycorp.com\/wp-content\/uploads\/2011\/05\/coc-ly-tam-lethy3.jpg",705,423,false],"thumbnail":["https:\/\/lethycorp.com\/wp-content\/uploads\/2011\/05\/coc-ly-tam-lethy3-150x150.jpg",150,150,true],"medium":["https:\/\/lethycorp.com\/wp-content\/uploads\/2011\/05\/coc-ly-tam-lethy3-300x180.jpg",300,180,true],"medium_large":["https:\/\/lethycorp.com\/wp-content\/uploads\/2011\/05\/coc-ly-tam-lethy3.jpg",640,384,false],"large":["https:\/\/lethycorp.com\/wp-content\/uploads\/2011\/05\/coc-ly-tam-lethy3.jpg",640,384,false],"1536x1536":["https:\/\/lethycorp.com\/wp-content\/uploads\/2011\/05\/coc-ly-tam-lethy3.jpg",705,423,false],"2048x2048":["https:\/\/lethycorp.com\/wp-content\/uploads\/2011\/05\/coc-ly-tam-lethy3.jpg",705,423,false],"trp-custom-language-flag":["https:\/\/lethycorp.com\/wp-content\/uploads\/2011\/05\/coc-ly-tam-lethy3.jpg",18,12,false],"bigger-recent-post-thumbnail":["https:\/\/lethycorp.com\/wp-content\/uploads\/2011\/05\/coc-ly-tam-lethy3-66x66.jpg",66,66,true]},"uagb_author_info":{"display_name":"Lethycorp","author_link":"https:\/\/lethycorp.com\/en\/author\/lethycorp"},"uagb_comment_info":0,"uagb_excerpt":"Vi\u1ec7c th\u1eed t\u1ea3i m\u00f3ng c\u1ecdc nh\u1eb1m x\u00e1c \u0111\u1ecbnh t\u1ea3i tr\u1ecdng gi\u1edbi h\u1ea1n theo \u0111\u1ea5t n\u1ec1n c\u1ee7a c\u1ecdc \u1ee9ng v\u1edbi chi\u1ec1u s\u00e2u thi\u1ebft k\u1ebf d\u1ef1 ki\u1ebfn, qua \u0111\u00f3 quy\u1ebft \u0111\u1ecbnh ch\u00ednh th\u1ee9c chi\u1ec1u d\u00e0i c\u1ecdc \u0111\u00fac \u0111\u1ea1i tr\u00e0, s\u01a1 \u0111\u1ed3 b\u1ed1 tr\u00ed c\u1ecdc. vi\u1ec7c th\u1eed t\u1ea3i m\u00f3ng c\u1ecdc ti\u1ebfn h\u00e0nh theo n\u1ed9i dung sau: \u0110\u1ec1 c\u01b0\u01a1ng&hellip;","_links":{"self":[{"href":"https:\/\/lethycorp.com\/en\/wp-json\/wp\/v2\/posts\/804","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lethycorp.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lethycorp.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lethycorp.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/lethycorp.com\/en\/wp-json\/wp\/v2\/comments?post=804"}],"version-history":[{"count":0,"href":"https:\/\/lethycorp.com\/en\/wp-json\/wp\/v2\/posts\/804\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lethycorp.com\/en\/wp-json\/wp\/v2\/media\/5550"}],"wp:attachment":[{"href":"https:\/\/lethycorp.com\/en\/wp-json\/wp\/v2\/media?parent=804"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lethycorp.com\/en\/wp-json\/wp\/v2\/categories?post=804"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lethycorp.com\/en\/wp-json\/wp\/v2\/tags?post=804"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}