Construction of bored piles for the Vinh Hai Social Housing Project 2026

  • BIDDING PACKAGE: PILE DRILLING CONSTRUCTION
  • PROJECT: SOCIAL HOUSING APARTMENTS INCLUDED IN THE PROJECT: VINH HAI SOCIAL HOUSING AREA
  • LOCATION: CHICKEN FARM LAND AREA, DAO VAN TIEN STREET, NORTH NHA TRANG WARD, KHANH HOA PROVINCE
  • Investor : VCN Urban Development Co., Ltd.
  • Construction Contractor LE THY CONSTRUCTION COMPANY LIMITED

The process of drilling bored piles according to technical standards.

In the pile foundation construction contract for the Social Housing Apartment Complex – Vinh Hai Social Housing Project, invested by VCN Urban Development Co., Ltd., Le Thy Construction Co., Ltd. continues to affirm its specialized foundation construction capabilities through a scientific construction organization process, strict geological control, and rigorous adherence to current technical standards.

The project is being implemented in the Trai Ga area, Dao Van Tien Street, Bac Nha Trang Ward, Khanh Hoa Province – an area with complex geological conditions, requiring high standards for soil surveying and pile foundation construction quality.

Through its modern equipment system, experienced engineering team, and rigorous geological control process, Le Thy Construction Company is gradually ensuring a solid foundation for large-scale social housing projects in the South Central region.
Le Thy Construction Company's expertise in foundation construction.

With many years of experience in the field of deep foundation construction, bored piles, and weak soil treatment, Le Thy Construction Company focuses on investing in:

🔹 High-power specialized pile drilling system

🔹 Crawler cranes, heavy lifting equipment

🔹 Bentonite/polymer solution pumping system

🔹 Field geological testing and inspection equipment

On-site images show that the construction process is well-organized, with continuous work both day and night to ensure the overall progress of the project.

A rigorous geological inspection process is carried out before pile drilling.

Before mass deployment, Le Thy's engineering team conducted detailed geological surveys in accordance with the design documents and technical standards:

🔎 Soil samples were taken at the site.

– Soil samples are collected during the drilling survey and brought to the surface for:

– Assessing the composition of soil – silt – sand

– Determine natural humidity

– Check load capacity

– Compare with the geological design documents.

🔎 Check the drilling fluid.

The borehole wall-stabilizing fluid is strictly controlled in terms of:

– Proportion

– Viscosity

– Sand content

– pH level


Regular inspections help ensure the stability of the borehole walls, preventing collapse during construction.

The process of constructing bored piles meets technical standards.

The bored pile construction work at the project was carried out by Le Thy Construction Company in accordance with the correct procedures:

✅ Accurate pile center positioning

Use a surveying system to determine the pile centerline and construction elevation according to the approved drawings.

✅ Drill holes using specialized equipment.

The high-powered crawler drilling machine operates stably, controlling the depth and diameter of the borehole precisely according to the design.

✅ Clean the bottom of the borehole

The process of flushing and removing sediment is carried out to ensure the quality of the pile base before lowering the steel cage.

✅ Erecting the steel cage

The steel cage was fabricated according to the drawings, with careful control of joints and spacing of spacers to protect the concrete.

✅ Pouring concrete using a tremie pipe

The concrete is supplied continuously, ensuring no segregation and no contamination with drilling fluid.

Commitment to quality, safety, and timeliness.

At the Vinh Hai Social Housing Project, Le Thy Construction Company is implementing a comprehensive set of measures:

🦺 Strictly adhere to workplace safety regulations.

📋 Complete construction log and acceptance documents

📐 Quality control for each pile

⏱️ Construction will proceed according to the investor's overall schedule.

📊 Closely coordinate with the supervisory consultant and project management team.

Organizing construction work at night with a high-powered site lighting system also demonstrates the contractor's proactive approach to project timelines and management capabilities.

Affirming our position as a reputable foundation contractor.

Through the contract for the construction of bored piles at the Vinh Hai Social Housing Project, Le Thy Construction Company continues to affirm its position as one of the leading contractors specializing in foundation construction in the Central and Southern regions of Vietnam.

Professionalism in geological surveys, standardized construction procedures, and a modern equipment system are the foundation upon which the company builds trust with investors and partners in large-scale projects.

Keywords:
Bored pile construction, Le Thy Construction, Vinh Hai project, Nha Trang social housing, deep foundation construction, bored pile drilling

Contact information:

  1. Address: No. 20, Street 37, Van Phuc Urban Area, Hiep Binh Phuoc Ward, Thu Duc City, Ho Chi Minh City
  2. Phone number: 0915.611.337 Mr. Phuong or 0915.411.337 Mr. Quan
  3. Email: [email protected] or [email protected]
  4. Website: Lethycorp.com
  5. Road Diagrami: See

Share:

Facebook
Twitter