Picture of LETHYCORP

LETHYCORP

New construction project of Ong Ngu Bridge, Ward 28

  • Tender Package: Construction (including construction and general items)
  • Category:
    • Supply and construction of reinforced concrete piles 350×350
    • Construction of Larsen sheet piles and bracing system.
    • Construction of temporary bridge
  • Contractors: Vinh Thinh Investment Joint Stock Company
  • Construction unit: Le Thy Construction Company Limited
  • Location: Ward 28, Binh Thanh District, City. Ho Chi Minh City
Some construction photos from the "New Ong Ngu Bridge Construction" project.“:

To construct Ong Ngu bridge, there are a number of important steps that need to be taken, detailed planning for bridge construction is needed, including assessment of technical requirements, geological and climatic conditions of the construction area. build. After that, a detailed design of Ong Ngu bridge must be carried out including factors such as materials used, shape and size.

Finally, after the bridge has been completely built, inspection must be conducted to ensure the safety and quality of the project.

Contact information:

Share:

Facebook
Twitter