Construction work of Sewer System - Phase 2

  • Project: Construction of a Drainage System to Improve the Water Environment of Ho Chi Minh City, Double Canal - Separate Canal - Tau Hu - Ben Nghe - Phase 2
  • Category: Lamsen IV pressed piles with DIK 07 jack hole
    • The larsen pole is 16m long
    • Hop Long Ho Jack (Finger Joint Pole 100%)
    • High precision and aesthetics
  • Location: Vo Van Kiet, District 5, City. HCM
  • Construction start time: 08/12/2016
Here are some construction photos from the "Current Drainage System - Phase 2" project:

Ho Chi Minh City Water Environment Improvement Project, Tau Hu – Ben Nghe – Doi Canal Basin channel Phase 2 is being implemented by the city.

During the construction phase of the Outer Drainage System, the project continues to improve the rainwater drainage system, contributing to reducing flooding in the Tau Hu – Ben Nghe – Doi – Te Canal basin. The project's components will be implemented and constructed in seven districts of Ho Chi Minh City, including districts 4, 5, 6, 8, 10, 11, and Binh Chanh, covering a total catchment area of 2,150 hectares. The total investment for the project is VND 11,282 billion, comprising ODA loans from Japan and counterpart funds from the national budget.street.

Together with the construction side of Le Thy Construction Co., Ltd., we are very honored to be able to construct the larsen IV sheet pile pressing and jacking holes for the Bao Sewer System construction project..