Here are some images of the "Urban Railway" project:
According to the Ho Chi Minh City Urban Railway Management Board (Management Board), the Long Binh Depot construction item (Long Binh ward, district 9) with a scale of 28 hectares will in the future become a repair and maintenance center, material warehouse and warehouse. training center, started construction in February 2008.
The contractor for the urban railway project has completed 70 percent of the construction work. Regarding the three main packages of the urban railway project, including the 2.6 km underground metro section from Ben Thanh to Ba Son, the 17.1 km elevated metro section, and the tracks and carriages, Ms. Tran Thi Anh Nguyet – Deputy Head of the Management Board, stated that the bidding documents for construction will be finalized in February 2009, after which an international tender will be organized.
Ho Chi Minh City People's Committee requests the authorities and People's Committees of districts 1, 2, 9, Binh Thanh and Thu Duc to urgently direct the compensation work and hand over the premises on time (before June 30, 2009). for investors of Urban Railway projects.
One of the biggest problems is that the section of the route is located within the Ba Son union enterprise campus.
According to the results of the recent meeting between the Ho Chi Minh City People's Committee and the General Department of Defense Industry, while awaiting the relocation of all factories to Ba Ria - Vung Tau (starting in 2010, completed in 2015), the Ba Son shipyard will continue to fulfill its duties and will hand over sufficient land for the construction of Metro Line 1 in 2010 to avoid affecting the progress of the urban railway project.
Launch many other projects
On January 23, 2009, the Standing Vice Chairman of Ho Chi Minh City People's Committee signed and issued two Decisions 360 and 361 approving the results of direct bidding for the package "Survey consulting, investment project preparation" for two metro lines No. 3b and number 4.
For the Metro Line 3b project (Ben Thanh – Hiep Binh Phuoc, Thu Duc), the joint venture of Southern Transport Design and Consulting Joint Stock Company (Tedi-South) and Bach Khoa Construction Consulting Joint Stock Company (BKC) was appointed by the Ho Chi Minh City leadership as the consulting contractor responsible for surveying and preparing the investment project. The project duration is four months, with a total contract value of nearly eight billion VND.
The consulting, surveying, and project planning contract for metro line 4 (Ben Cat Bridge – Nguyen Van Linh Boulevard), worth nearly 13 billion VND, was awarded to the Transport Construction Investment Consulting Joint Stock Company (TRICC-JSC) with a completion time of 150 days.
Contact information:
- Address: No. 12, Street 27, Van Phuc Urban Area, Hiep Binh Phuoc Ward, Thu Duc City, HCMC
- Phone number: 0915.611.337 Mr. Phuong or 0915.411.337 Mr. Quan
- Email: [email protected] or [email protected]
- Website: Lethycorp.com
- Road Map: See


