Construction work of Sewer System - Phase 2

  • Project: Construction of Covered Sewer System to Improve HCM water environment, double canal basin - single canal - Tau Hu - Ben Nghe - Phase 2
  • Category: Lamsen IV pressed piles with DIK 07 jack hole
    • The larsen pole is 16m long
    • Hop Long Ho Jack (Finger Joint Pole 100%)
    • High precision and aesthetics
  • Location: Vo Van Kiet, District 5, City. HCM
  • Construction start time: 08/12/2016
Some construction images at the project "Coated Culvert System - Phase 2":

City water environment improvement project. HCM, basin of Tau Hu canal - Ben Nghe - Doi canal - channel Phase 2 is being implemented by the city.

During the construction phase of the Covered Sewer System, the project continues to improve the rainwater drainage system, contributing to reducing flooding in the basin of Tau Hu - Ben Nghe - Doi - Te canal. The project's construction items will be deployed and built in 7 districts of the city including districts 4, 5, 6, 8, 10, 11 and Binh Chanh with a total basin area of 2,150 hectares. The total investment of the project is 11,282 billion VND, including ODA loans from Japan and counterpart capital from the Thai budget.street.

Together with the construction side of Le Thy Construction Co., Ltd., we are very honored to be able to construct the larsen IV sheet pile pressing and jacking holes for the Bao Sewer System construction project..