- Contractors: Enterprise 301 – Construction and Investment Joint Stock Company 3.
- Category: Supply and press reinforced concrete piles 300X300; Mark 350
"Dinh Bo Linh Bridge" project:
Dinh Bo Linh Bridge on Dinh Bo Linh Street, Binh Thanh District, City. HCM has a load capacity of 13 tons Newly constructed for vehicles with a tonnage of up to 30 tons or extra-long or extra-heavy vehicles. According to Mr. Le Quyet Thang - Director of Urban Traffic Management Area No. 1, construction will be completed Build a temporary bridge for two-wheeled traffic.
Then the contractor will demolish half of Dinh Bo Linh bridge to build a new bridge, leaving the remaining bridge for car traffic. And then continue to destroy The remaining half of the old bridge is left to build a new one. According to the plan, the Dinh Bo Linh bridge upgrading project will be completed in early 2012 with a cost of 30 billion VND.
Contact Info:
- Address: No. 12, Street 27, Van Phuc Urban Area, Hiep Binh Phuoc Ward, Thu Duc City, HCMC
- Phone number: 0915.611.337 Mr. Phuong Or 0915.411.337 Mr. Quan
- Email: [email protected] or [email protected]
- Website: Lethycorp.com
- Road Map: See