- Construction: Cheng Loong Paper Mill River Water Treatment Plant – Phase 2
- Category:
- Construction of PHC D350A pile pressing
- Construction, installation and completion of the factory
- Location: Road AT031, An Tay commune, Ben Cat town, Binh Duong province
- Construction unit: Le Thy Construction Company Limited
Here are some construction photos from the "Cheng Loong Paper Mill River Water Treatment Plant" project:
Images of PHC D350A pile driving work at the "Cheng Loong Paper Mill River Water Treatment Plant" project.“