VGI3 Factory and Float Glass Line Renovation Project

  • Category: Construction of D350 pile pressing
    • Crane lowering piles and construction Pile BTLT D350, Pmax=150T
    • 28 meters x 28 meters/tim (Office)
    • 38 meters x 28 meters/tim (Sand storage)
    • 8 meters x 22 meters/tim (Sand storage)
  • Construction, installation and completion of the factory
  • Location: My Xuan A Industrial Park, My Xuan commune, Tan Thanh district, BRVT province
  • Subcontractors: Solution Construction and Equipment Company Limited
  • Construction unit: Le Thy Construction Company Limited

Some construction images at the project "Renovating the Float Glass Line and VGI3 Factory":

Some construction images at the project "Renovating the Float Glass Line and VGI3 Factory":

Contact Info:

See More Construction of larsen piles and bracing for Phu My new urban area

 

en_US