- Construction: Hospital Walking Tunnel 115
- Category:
- Drilling - pressing reinforced concrete piles 300×300
- Rental of larsen piles and installation and dismantling of shoring systems
- Category: Drilling - pressing 300×300 reinforced concrete piles, renting and extracting Larsen piles and installing and dismantling shoring systems
- Contractors: Duc Anh Joint Stock Company
- Construction unit: Le Thy Construction Company Limited
- Location: 818 Su Van Hanh, Ward 12, District 10, City. HCM
Some construction images at the project "Hospital Pedestrian Tunnel 115":
In December 2017, Le Thy Construction Company Limited and Duc Anh Joint Stock Company officially signed a contract to construct the BV 115 pedestrian tunnel project with a construction period of 3 months. This is one of the traffic underground tunnel projects that Le Thy constructed (An Suong Underground Tunnel) in 2017, proving that Le Thy's basement construction capacity is increasingly improved and trusted by many contractors.
Contact Info:
- Address: No. 12, Street 27, Van Phuc Urban Area, Hiep Binh Phuoc Ward, Thu Duc City, HCMC
- Phone number: 0915.611.337 Mr. Phuong Or 0915.411.337 Mr. Quan
- Email: [email protected] or [email protected]
- Website: Lethycorp.com
- Road Map: See