- Construction: Hospital Walking Tunnel 115
- Category:
- Drilling and driving of 300x300 reinforced concrete piles.
- Rental of larsen piles and installation and dismantling of shoring systems
- Category: Drilling and pile driving for 300x300 reinforced concrete piles, rental for driving and removing Larsen sheet piles, and installation and dismantling of shoring systems.
- Contractors: Duc Anh Joint Stock Company
- Construction unit: Le Thy Construction Company Limited
- Location: 818 Su Van Hanh, Ward 12, District 10, City. HCM
Here are some construction photos from the "115 Hospital Pedestrian Tunnel" project:
In December 2017, Le Thy Construction Company Limited and Duc Anh Joint Stock Company officially signed a contract to construct the BV 115 pedestrian tunnel project with a construction period of 3 months. This is one of the traffic underground tunnel projects that Le Thy constructed (An Suong Underground Tunnel) in 2017, proving that Le Thy's basement construction capacity is increasingly improved and trusted by many contractors.
Contact information:
- Address: No. 12, Street 27, Van Phuc Urban Area, Hiep Binh Phuoc Ward, Thu Duc City, HCMC
- Phone number: 0915.611.337 Mr. Phuong or 0915.411.337 Mr. Quan
- Email: [email protected] or [email protected]
- Website: Lethycorp.com
- Road Map: See


