- Construction: Construction of New Warehouse – Cai Mep Port
- Category:
- Ground treatment, Supply and pressing of concrete piles D300, D350
- Construction, installation and completion of the factory
- Location: Cai Mep Port – Ba Ria Vung Tau
- Work performed:
- Cut asphalt concrete into holes measuring 0.7m x 0.7 meters. Dig a hole 0.6m deep
- Providing piles D300, D350
- Transport the crane to the construction site. Deploy mass pile driving in the pre-dug holes.
Here are some construction photos from the "Cai Mep Port Warehouse" project:
Contact information:
- Address: No. 12, Street 27, Van Phuc Urban Area, Hiep Binh Phuoc Ward, Thu Duc City, HCMC
- Phone number: 0915.611.337 Mr. Phuong or 0915.411.337 Mr. Quan
- Email: [email protected] or [email protected]
- Website: Lethycorp.com
- Road Map: See


