- Package: Construction (including construction and general items)
- Category:
- Supply and construction of reinforced concrete piles 350×350
- Construction of larsen piles & bracing system
- Construction of temporary bridge
- Contractors: Vinh Thinh Investment Joint Stock Company
- Construction unit: Le Thy Construction Company Limited
- Location: Ward 28, Binh Thanh District, City. Ho Chi Minh City
Some construction images at the project "New construction of Ong Ngu Bridge":
To construct Ong Ngu bridge, there are a number of important steps that need to be taken, detailed planning for bridge construction is needed, including assessment of technical requirements, geological and climatic conditions of the construction area. build. After that, a detailed design of Ong Ngu bridge must be carried out including factors such as materials used, shape and size.
Finally, after the bridge has been completely built, inspection must be conducted to ensure the safety and quality of the project.
Contact Info:
- Address: No. 12, Street 27, Van Phuc Urban Area, Hiep Binh Phuoc Ward, Thu Duc City, HCMC
- Phone number: 0915.611.337 Mr. Phuong Or 0915.411.337 Mr. Quan
- Email: [email protected] or [email protected]
- Website: Lethycorp.com
- Road Map: See