- Category:
- Rental, pressing and extraction of larsen SP IV piles and construction, installation and dismantling of shoring systems
- Construction, installation and completion of the factory
- Contractors: LC Saigon Construction Investment Company Limited
- Construction unit: Le Thy Construction Company Limited
- Location: Mai Dam town, Chau Thanh district, Hau Giang province
Some construction images at the project "Cooling Outlet for Song Hau Thermal Power Plant":
In March 2018, Le Thy Construction Co., Ltd. cooperated with LC Saigon Construction Company to sign a contract for the project: "Cooling Outlet for Song Hau Thermal Power Plant" to construct items: Rental, pile extraction. larsen SP IV and construction, installation and dismantling of the shoring system with a completion time of 7 months. This proves the growing prestige and capacity of Le Thy Construction Company Limited, which is trusted and cooperated by contractors.
Contact Info:
- Address: No. 12, Street 27, Van Phuc Urban Area, Hiep Binh Phuoc Ward, Thu Duc City, HCMC
- Phone number: 0915.611.337 Mr. Phuong Or 0915.411.337 Mr. Quan
- Email: [email protected] or [email protected]
- Website: Lethycorp.com
- Road Map: See