I.Introduction of larsen poles and larsen pole production process

larsen (Sheet pile) is a sheet member designed into keyways to form a closed retaining wall. It is effective to prevent water or prevent soil in other applications. Piles OLDYes larsen (Sheet pileincludes sections obtained by drawing, folding or rolling, stamping and forming in diving machines, or assembled from rolled parts…

spcularsen

Construction of larsen piles at Tung Ho steel factory

Production process Sheet pileAfter the steel is refined through a complex steelmaking process requiring advanced techniques and technology, the raw material is cast into ingots. These ingots are then melted and shaped into steel piles. Sheet pile

 Construction and installation of shoring kingpost system

hegiangchongshoringkingpost

Product parameters of larsen poles according to JIS . standards

ParameterLarsen SPIIILarsen SPIV
Length (mm)6000 – 180006000 – 18000
Width (mm)400400
Height (mm)125170
Thickness (mm)1315.5
Weight / kg)6076.1
ivn cu larsen 58616 0 0

          

Advantages of larsen products

  • larsen (Sheet pile) easily joined by a weld or bolt to increase the length.
  • Steel sheet pile Sheet pile can be used many times so it is very effective economic results.
  • Using steel sheet piles good larsen (Sheet pile) for slope stabilization or embankment in road works, tunnel through some complex hilly terrain.
  • larsen (Sheet pile) can withstand high stress both during construction and during use.
  • Sheet pile capable of withstanding great force while the weight is too small.

Product pictures of larsen poles

1kenhtauhu1

II.Confidenceh Construction of Larsen piling and support frame system:

Construction:

– The construction process is outlined in our construction method drawings. squeezing Larsen:

Step 1: Press the first pile bar to the specified depth.

Step 2: Press the second pile bar and determine the load capacity of the pile.

Step 3: Raise the machine body and stop at the position of the pile clamp lower than the pile head.

Step 4: After stabilizing, raise the pile press machine.

Step 5: Push the hammer head pile clamp forward and rotate the clamp from right to left.

Step 6: Adjust the hammer head to the pile to drive the pile down slowly.

Step 7: Dig the soil and transport the soil out to a depth of 1m compared to the MTN

Step 8: Mounting set anti-shorring king post frame system

– A key point to note during the pile driving process is that careful alignment is necessary to prevent the piles from tilting.

Shorelethy

                                                   Image: Larsen poles and frame system

GIOITHIEU4

The above are all the most basic technical and organizational measures that the contractor is expected to apply during the construction process. With the professional qualifications and experience of technical staff, with highly skilled workers, with modern equipment and the ability to complete the work that have been tested through the projects over the years.

We affirm that if selected and assigned by the investor, our contractor will complete and hand over to the investor a work of quality, high art and handover on schedule. .