I.Introduction of larsen poles and larsen pole production process
larsen (Sheet pile) is a sheet member designed into keyways to form a closed retaining wall. It is effective to prevent water or prevent soil in other applications. Piles OLDYes larsen (Sheet pile) includes sections obtained by drawing, folding or rolling, stamping and forming in diving machines, or assembled from rolled parts…
Construction of larsen piles at Tung Ho steel factory
Production process Sheet pile: After the steel is refined through a complex steelmaking process that requires high technique and technology, the raw material is cast into a billet. Then the billet continues to melt to form the pile steel product Sheet pile
Construction and installation of shoring kingpost system
Product parameters of larsen poles according to JIS . standards
Parameter | Larsen SPIII | Larsen SPIV |
Length (mm) | 6000 – 18000 | 6000 – 18000 |
Width (mm) | 400 | 400 |
Height (mm) | 125 | 170 |
Thickness (mm) | 13 | 15.5 |
Weight / kg) | 60 | 76.1 |
Advantages of larsen products
- larsen (Sheet pile) easily joined by a weld or bolt to increase the length.
- Steel sheet pile Sheet pile can be used many times so it is very effective economic results.
- Using steel sheet piles good larsen (Sheet pile) for slope stabilization or embankment in road works, tunnel through some complex hilly terrain.
- larsen (Sheet pile) can withstand high stress both during construction and during use.
- Sheet pile capable of withstanding great force while the weight is too small.
Product pictures of larsen poles
II.Confidenceh Construction of Larsen piling and support frame system:
Construction:
– The construction process is shown by us in the construction method process drawing squeezing Larsen:
Step 1: Press the first pile bar to the specified depth.
Step 2: Press the second pile bar and determine the load capacity of the pile.
Step 3: Raise the machine body and stop at the position of the pile clamp lower than the pile head.
Step 4: After stabilizing, raise the pile press machine.
Step 5: Push the hammer head pile clamp forward and rotate the clamp from right to left.
Step 6: Adjust the hammer head to the pile to slowly lower the pile.
Step 7: Dig the soil and transport the soil out to a depth of 1m compared to the MTN
Step 8: Mounting set anti-shorring king post frame system
– Note of the pressing part is to carefully align so that the pile is not skewed.
Image: Larsen poles and frame system
The above are all the most basic technical and organizational measures that the contractor is expected to apply during the construction process. With the professional qualifications and experience of technical staff, with highly skilled workers, with modern equipment and the ability to complete the work that have been tested through the projects over the years.
We affirm that if selected and assigned by the investor, our contractor will complete and hand over to the investor a work of quality, high art and handover on schedule. .
Contact Info:
- Address: No. 12, Street 27, Van Phuc Urban Area, Hiep Binh Phuoc Ward, Thu Duc City, HCMC
- Phone number: 0915.611.337 Mr. Phuong Or 0915.411.337 Mr Quan
- Email: [email protected] or [email protected]
- Website: Lethycorp.com
- Road Map: See