CONSTRUCTION MEASURES FOR PILE PRESSING USING ROBOT
1. Test pile pressing
– Use an electronic total station to locate the pile center.
-Gather piles to construction location
-Craft the pile into the pressing position, accurately adjust the center of the pile
-Align the pile upright and press
-Press each pile stroke until the end of a pile section, connecting the pile accurately
-The last part is pressed with the negative pole. After pressing, pull out the negative pressing tool.
-Stop pressing when Pmax reaches the requirements according to the design documents.
-Conduct loading for static compression and produce results
2. Mass pressing
Similar to static test pressing
-Conduct mass pressing after experimental results are available
-Stop pressing when the pile top depth and height reach the design and the allowable pressure according to the design.
- Note:
- Location of gathering piles
- Cable hook part
- Direction of pile movement
- Arm
- Pile
- Load Department
- Pile heart position
Contact Info:
- Address: No. 12, Street 27, Van Phuc Urban Area, Hiep Binh Phuoc Ward, Thu Duc City, HCMC
- Phone number: 0915.611.337 Mr. Phuong Or 0915.411.337 Mr. Quan
- Email: [email protected] or [email protected]
- Website: Lethycorp.com
- Road Map: See
Tags search information: provide BTC . pile,supply square pile,round pile supply,larsen poles,construction kingpost shoring,foundation construction,lethycorp pile pressing, concrete pile pressing, larsen's cunt, cyes larsen, larsen eps, pressed iron piles, pressure on people's houses, bored pile drilling,