Skip to content
Home page
INTRODUCE
PROJECT
CAPACITY
WORK
CONTACT
Main Menu
Home page
INTRODUCE
PROJECT
CAPACITY
WORK
CONTACT
Pressing concrete piles by hydraulic robot 500T
Detail
Le Thy Construction Company Limited 2023
Detail
Phu My New Urban Area Project
Detail
Construction of the basement of a high-rise building
Detail
Construction of PHC D800C pile driving - Tan Phu Dong Wind Power 1
Detail
District 1 Officetel Complex Project
Detail
Construction of bored pile drilling at Merry Land Project
Detail
Construction equipment rental
Detail
Page
1
Page
2
Page
3
Page
4
Page
5
RELATED ARTICLES
Barret Wall Drilling And Steel Hole Lowering According To American Standards
Details »
Larsen super-fast pile driving with robot: Fast, accurate, economical 2025
Details »
LE THY RECEIVED AWARD AT VIETNAM CONSTRUCTION AWARDS 2024
Details »
VI
VI
EN
VI
VI
EN